Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Echs Supply And Replacement Of Damaged Worn Out Railway Track Rails With Required Accessories For Strengthening Of Engine Escape Line And Wagon Loader 2
|
| Description |
Echs Supply And Replacement Of Damaged Worn Out Railway Track Rails With Required Accessories For Strengthening Of Engine Escape Line And Wagon Loader 2 Line At Nctps 1 Athipattu Aip Railway Siding Area To Carry Out Manual Unloading Operation F
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_429122_1 |
|
Reference Number |
CE/NCTPSI/SE/MII/SpNo123/23-24 |
| Tender Fee | 0 |
| EMD | 2 Lakh |
| Tender Value | - |
| Place | work |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=510220 |
| Start Date | February 22, 2024 23:00 |
| End Date |
Expired
25/03/2024
Expired 938 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of machinery for leading of rails, fishplates & other material from various locations over northern railway including shifting of rails and fabricated glued joint and other allied works to facilitate fabrication of insulated glued joints at glued joint workshop, in track depot ghaziabad for a period of two years.
Hiring of machinery for leading of rails, fishplates & other material from various locations over northern railway including shifting of rails and fabricated glued joint and other allied works to facilitate fabrication of insulated glued joints at glued joint workshop, in track depot ghaziabad for a period of two years.
Read moreSupplying of 60000 cum of machine crushed track ballast 50mm size conforming to rdso s specification of track ballast (february - 2023 edition with upto date correction slips) and loading the same into any type of railway wagon, f.o.r. pakur /bakudih/barharwa for sonpur division.
Supplying of 60000 cum of machine crushed track ballast 50mm size conforming to rdso s specification of track ballast (february - 2023 edition with upto date correction slips) and loading the same into any type of railway wagon, f.o.r. pakur /bakudih/barharwa for sonpur division.
Read moreFlash butt welding of uic 60kg r260/90 uts 20 rail panels (new/in-service) in track under traffic block in mid-section and station yards using contractor s own rail cum road vehicle mounted flash butt mobile welding plant and flash butt welding of 90 uts rails using contractor s self-propelled rail cum road / mobile fbw plants in loop lines as per railway s specifications in the track renewal works, over south central railway
Flash butt welding of uic 60kg r260/90 uts 20 rail panels (new/in-service) in track under traffic block in mid-section and station yards using contractor s own rail cum road vehicle mounted flash butt mobile welding plant and flash butt welding of 90 uts rails using contractor s self-propelled rail cum road / mobile fbw plants in loop lines as per railway s specifications in the track renewal works, over south central railway
Read moreManufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.
Manufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.
Read moreReplacement of rails and sleepers at different locations along the bvfcl railway track.
Replacement of rails and sleepers at different locations along the bvfcl railway track.
Read moreDismantling and shifting of rails, sleepers, and other associated materials within the bvfcl railway track.
Dismantling and shifting of rails, sleepers, and other associated materials within the bvfcl railway track.
Read moreDismantling and shifting of rails, sleepers, and other associated materials within the bvfcl railway track.
Dismantling and shifting of rails, sleepers, and other associated materials within the bvfcl railway track.
Read moreServices for preparation of feasibility report, detailed project reportin connection with engine escape lines at wagon tipplers (02 nos.)
Services for preparation of feasibility report, detailed project reportin connection with engine escape lines at wagon tipplers (02 nos.)
Read moreWork of routine, prive and breakdown maintenance, repair/ rectification works of rail track private siding , r.c.c. rail track at wagon tippler, worn out damaged points and crossings and switch rails of chp-a and chp-b of obra thermal power pr
Work of routine, prive and breakdown maintenance, repair/ rectification works of rail track private siding , r.c.c. rail track at wagon tippler, worn out damaged points and crossings and switch rails of chp-a and chp-b of obra thermal power pr
Read moreWork of routine, prive and breakdown maintenance, repair/ rectification works of rail track private siding , r.c.c. rail track at wagon tippler, worn out damaged points and crossings and switch rails of chp-a and chp-b of obra thermal power pr
Work of routine, prive and breakdown maintenance, repair/ rectification works of rail track private siding , r.c.c. rail track at wagon tippler, worn out damaged points and crossings and switch rails of chp-a and chp-b of obra thermal power pr
Read moreof your Industry type