Tender Details

Particulars Details
Title
Echs Supply And Replacement Of Damaged Worn Out Railway Track Rails With Required Accessories For Strengthening Of Engine Escape Line And Wagon Loader 2
Description
Echs Supply And Replacement Of Damaged Worn Out Railway Track Rails With Required Accessories For Strengthening Of Engine Escape Line And Wagon Loader 2 Line At Nctps 1 Athipattu Aip Railway Siding Area To Carry Out Manual Unloading Operation F
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_429122_1
Reference
Number
CE/NCTPSI/SE/MII/SpNo123/23-24
Tender Fee 0
EMD 2 Lakh
Tender Value -
Place work
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=510220

Start Date February 22, 2024 23:00
End Date
Expired 25/03/2024

Expired 938 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Hiring of machinery for leading of rails, fishplates & other material from various locations over northern railway including shifting of rails and fabricated glued joint and other allied works to facilitate fabrication of insulated glued joints at glued joint workshop, in track depot ghaziabad for a period of two years.

Hiring of machinery for leading of rails, fishplates & other material from various locations over northern railway including shifting of rails and fabricated glued joint and other allied works to facilitate fabrication of insulated glued joints at glued joint workshop, in track depot ghaziabad for a period of two years.

Read more
Supplying of 60000 cum of machine crushed track ballast 50mm size conforming to rdso s specification of track ballast (february - 2023 edition with upto date correction slips) and loading the same into any type of railway wagon, f.o.r. pakur /bakudih/barharwa for sonpur division.

Supplying of 60000 cum of machine crushed track ballast 50mm size conforming to rdso s specification of track ballast (february - 2023 edition with upto date correction slips) and loading the same into any type of railway wagon, f.o.r. pakur /bakudih/barharwa for sonpur division.

Read more
Flash butt welding of uic 60kg r260/90 uts 20 rail panels (new/in-service) in track under traffic block in mid-section and station yards using contractor s own rail cum road vehicle mounted flash butt mobile welding plant and flash butt welding of 90 uts rails using contractor s self-propelled rail cum road / mobile fbw plants in loop lines as per railway s specifications in the track renewal works, over south central railway

Flash butt welding of uic 60kg r260/90 uts 20 rail panels (new/in-service) in track under traffic block in mid-section and station yards using contractor s own rail cum road vehicle mounted flash butt mobile welding plant and flash butt welding of 90 uts rails using contractor s self-propelled rail cum road / mobile fbw plants in loop lines as per railway s specifications in the track renewal works, over south central railway

Read more
Manufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.

Manufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.

Read more
Replacement of rails and sleepers at different locations along the bvfcl railway track.

Replacement of rails and sleepers at different locations along the bvfcl railway track.

Read more
Dismantling and shifting of rails, sleepers, and other associated materials within the bvfcl railway track.

Dismantling and shifting of rails, sleepers, and other associated materials within the bvfcl railway track.

Read more
Dismantling and shifting of rails, sleepers, and other associated materials within the bvfcl railway track.

Dismantling and shifting of rails, sleepers, and other associated materials within the bvfcl railway track.

Read more
Services for preparation of feasibility report, detailed project reportin connection with engine escape lines at wagon tipplers (02 nos.)

Services for preparation of feasibility report, detailed project reportin connection with engine escape lines at wagon tipplers (02 nos.)

Read more
Work of routine, prive and breakdown maintenance, repair/ rectification works of rail track private siding , r.c.c. rail track at wagon tippler, worn out damaged points and crossings and switch rails of chp-a and chp-b of obra thermal power pr

Work of routine, prive and breakdown maintenance, repair/ rectification works of rail track private siding , r.c.c. rail track at wagon tippler, worn out damaged points and crossings and switch rails of chp-a and chp-b of obra thermal power pr

Read more
Work of routine, prive and breakdown maintenance, repair/ rectification works of rail track private siding , r.c.c. rail track at wagon tippler, worn out damaged points and crossings and switch rails of chp-a and chp-b of obra thermal power pr

Work of routine, prive and breakdown maintenance, repair/ rectification works of rail track private siding , r.c.c. rail track at wagon tippler, worn out damaged points and crossings and switch rails of chp-a and chp-b of obra thermal power pr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise