Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Restoration Works For Laying Of Pipe Line As Proposed By Barasat Division, Phed Along Taki Murarisha Bhebia Chaital Road From Chainage 11.50 Km. To 20.00 Km. Under Barasat Highway Division I In The District Of North 24 Parganas. (Deposit W
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1.7 Lakh |
Tender Value | |
Place | BASIRHAT |
Link |
AAAAAAAAAA Login to view |
Start Date | May 28, 2025 14:30 |
End Date |
11/06/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewRestoration works for laying of pipe-line as proposed by barasat division, phed along taki - murarisha - bhebia - chaital road from chainage 11.50 km. to 20.00 km. under barasat highway division i in the district of north 24 parganas. (deposit w
Read moreRoad safety measures by fixing of speed limit road signage of different roads under baguihati highway sub-division of barasat highway division no.-i in the district of north 24 parganas.
Road safety measures by fixing of speed limit road signage of different roads under baguihati highway sub-division of barasat highway division no.-i in the district of north 24 parganas.
Read moreAAAAAAAAAA
Login to viewRestoration to cutting the road crust by the cesc authority for laying their underground cable of ghoshpara road at 21.40 km (402, ichhapur, r/s) north 24 parganas under pwd barrackpore division during the year 2025-26.
Read moreSankrail to manikpur hirapur bazar road from 2.50 km to 2.70 km, emergent temporary restoration work in various stretches for laying of phe pipe line under howrah highway sub-division of howrah highway division
Sankrail to manikpur hirapur bazar road from 2.50 km to 2.70 km, emergent temporary restoration work in various stretches for laying of phe pipe line under howrah highway sub-division of howrah highway division
Read moreWbpwrd/ee/bhd-i/enit01/25-26/1
Restoration of damages likely to be occurred during ofc laying by hdd method of jio digital fibre pvt. ltd. at inspection road along lower bagjola canal from 2.40 km. to 3.886 km. under barasat highway division i in the district of north 24 parganas.
Read moreSankrail to manikpur hirapur bazar road, from 1.80 km to 2.50 km, emergent temporary restoration work in various stretches for laying of phe pipe line of howrah highway sub-division under howrah highway division
Sankrail to manikpur hirapur bazar road, from 1.80 km to 2.50 km, emergent temporary restoration work in various stretches for laying of phe pipe line of howrah highway sub-division under howrah highway division
Read moreRestoration work of road damaged due to laying of o.f.c. by micro tunneling in hdd method by bharti airtel ltd. from 8.122 kmp to 8.747 kmp , dumdum-lauhati road under barasat highway divn. no. i, in the dist. of north 24 pgs.
Restoration work of road damaged due to laying of o.f.c. by micro tunneling in hdd method by bharti airtel ltd. from 8.122 kmp to 8.747 kmp , dumdum-lauhati road under barasat highway divn. no. i, in the dist. of north 24 pgs.
Read moreWbpwrd/ee/bhd-i/enit27/24-25/1
Restoration of road surface from chainage 6.50 km. to 7.50 km. (kolkata bound flank main carriageway), in stretches, of kni avenue under barasat highway division i in the district of north 24 parganas.
Read moreWbpwrd/ee/bhd-i/enit26/24-25/1
Construction of rcc cross-drain at chainage 17.80 km. of lauhati - haroa road under barasat highway division i in the district of north 24 parganas.
Read moreWbpwrd/ee/bhd-i/enit24/24-25/1
Restoration of road and drain damaged by various utility services at dumdum - lauhati road from 2.60 km. to 3.60 km. and 6.00 kmp. to 7.50 km. under barasat highway division i in the district of north 24 parganas.
Read moreof your Industry type