Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Fabrication Of One No. (01) Double Stack Pontoon With A Total Of 80 Drums (48 Drums On Top Of The 32 Drums At The Bottom) For 2000 Gpm Motor Installation At The New Eastern Side Sump Of Jocp In The Hzb Area.
|
| Description |
Complete Fabrication Of One No. (01) Double Stack Pontoon With A Total Of 80 Drums (48 Drums On Top Of The 32 Drums At The Bottom) For 2000 Gpm Motor Installation At The New Eastern Side Sump Of Jocp In The Hzb Area.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_334550_1 |
|
Reference Number |
PO/JOCP/EnM/Tender/25-26/03 |
| Tender Fee | 0 |
| EMD | 5300 |
| Tender Value | - |
| Place | JOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346806 |
| Start Date | April 26, 2025 16:30 |
| End Date |
Expired
06/05/2025
Expired 530 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing 01 no. one 36-drum (6x6) pontoon for 1000 gpm pump-motors foundation with repairing of 2 nos. pipeline ranges at jocp under hzb area.
Repairing 01 no. one 36-drum (6x6) pontoon for 1000 gpm pump-motors foundation with repairing of 2 nos. pipeline ranges at jocp under hzb area.
Read moreFabrication of one (01) no. 36-drum (6x6) pontoon for 1000 gpm pump-motor foundation of reddy sump and maintenance of one (01) no. 36-drum (6x6) pontoon for 1000 gpm supply pump-motor foundation of main sump at jocp.
Fabrication of one (01) no. 36-drum (6x6) pontoon for 1000 gpm pump-motor foundation of reddy sump and maintenance of one (01) no. 36-drum (6x6) pontoon for 1000 gpm supply pump-motor foundation of main sump at jocp.
Read moreErection of 3.3kv oh lines from main sump double pole to reddy sump for installation of lighting transformers near reddy sump jocp, hzb area.
Erection of 3.3kv oh lines from main sump double pole to reddy sump for installation of lighting transformers near reddy sump jocp, hzb area.
Read moreRepairing 01 no. one 36-drum (6x6) pontoon and fabricating 01 no. one 36-drum (6x6) pontoon for 1000 gpm pump-motor foundation. at jocp.
Repairing 01 no. one 36-drum (6x6) pontoon and fabricating 01 no. one 36-drum (6x6) pontoon for 1000 gpm pump-motor foundation. at jocp.
Read moreShifting of 2000 gpm and 4000 gpm pump in the lower side of the sump along with di of its 10in/8in delivery pipeline at jocp sump under abocp mine
Shifting of 2000 gpm and 4000 gpm pump in the lower side of the sump along with di of its 10in/8in delivery pipeline at jocp sump under abocp mine
Read moreShifting of 2000 gpm and 4000 gpm pump in the lower side of the sump long with di of its 10inch/8inch dia delivery pipeline at jocp sump under abocp mine
Shifting of 2000 gpm and 4000 gpm pump in the lower side of the sump long with di of its 10inch/8inch dia delivery pipeline at jocp sump under abocp mine
Read moreReplacement/installa tion of 3000 gpm pumps and shifting of pontoon at west sump at akwmc katras area
Replacement/installa tion of 3000 gpm pumps and shifting of pontoon at west sump at akwmc katras area
Read moreLaying of new pipe range at new eastern side sump for dewatering sump water in order to extract ob/coal from 3rd-4th seam under jocp under hzb area.
Laying of new pipe range at new eastern side sump for dewatering sump water in order to extract ob/coal from 3rd-4th seam under jocp under hzb area.
Read moreWork of fabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 gpm each to in the quarry sump for quick dewatering at peocp under hzb. area.
Work of fabrication, painting and commissioning of two (02) nos pontoon for two (02) nos of pumps of capacity 1000 gpm each to in the quarry sump for quick dewatering at peocp under hzb. area.
Read moreLaying of 8 inches additional pipe range at new eastern side sump for continuous dewatering sump water in order to extract ob/coal from 3rd-4th seam under jocp under hzb area
Laying of 8 inches additional pipe range at new eastern side sump for continuous dewatering sump water in order to extract ob/coal from 3rd-4th seam under jocp under hzb area
Read moreof your Industry type