Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication Of 01 Nos Drum Pontoon And Installation Of Pontoon With 3000 Gpm Pump And Motor Of Ena Colliery Under Kusunda Area No 6
|
| Description |
Fabrication Of 01 Nos Drum Pontoon And Installation Of Pontoon With 3000 Gpm Pump And Motor Of Ena Colliery Under Kusunda Area No 6
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_343302_1 |
|
Reference Number |
BCCL/AVI/EnM/2025-26/75 |
| Tender Fee | 0 |
| EMD | 2300 |
| Tender Value | |
| Place | Ena |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=355861 |
| Start Date | September 06, 2025 16:30 |
| End Date |
Expired
19/09/2025
Expired 283 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication and repairing of 150 hp direct haulage for smooth and safe haulage operation at pit no. 09 in madhaipur colliery under pandaveswar area.
Fabrication and repairing of 150 hp direct haulage for smooth and safe haulage operation at pit no. 09 in madhaipur colliery under pandaveswar area.
Read moreRepairing of vct boiler no. wbl-6035 at madhaipur colliery under pandaveswar area and repairing of boiler injector and steam pipeline 9, 1, 5 and 6 pit of madhaipur colliery
Repairing of vct boiler no. wbl-6035 at madhaipur colliery under pandaveswar area and repairing of boiler injector and steam pipeline 9, 1, 5 and 6 pit of madhaipur colliery
Read moreProviding and fixingof bearing no.22230k and sleeve with check nut h3130 of tb-3discharge drum at hbm, under rampur sub area, orient area, mcl
Providing and fixingof bearing no.22230k and sleeve with check nut h3130 of tb-3discharge drum at hbm, under rampur sub area, orient area, mcl
Read moreSupply and installation of 35hp submersible motor with 4500lpm discharge capacity having head 20 meter over area under mc hisar
Supply and installation of 35hp submersible motor with 4500lpm discharge capacity having head 20 meter over area under mc hisar
Read moreProcurement, installation and commissioning of two nos. vacuum pump with replacement of existing steam jet ejectors at gtps
Procurement, installation and commissioning of two nos. vacuum pump with replacement of existing steam jet ejectors at gtps&#x0d
Read moreRepair/maint of pump motor control panels, starters and allied works at jalapahar area under age (i) darjeeling
Repair/maint of pump motor control panels, starters and allied works at jalapahar area under age (i) darjeeling
Read moreDrilling of 10 nos of boreholes with casing (non-coring )150 mm diameter with lowering and casing of pipes from surface to xiii/xiv seam is urgently required at kenduiadh colliery under p.b area
Drilling of 10 nos of boreholes
 with casing (non-coring )150
 mm diameter with lowering and
 casing of pipes from surface to
 xiii/xiv seam is urgently
 required at kenduiadh colliery
 under p.b area
Read moreRepair and maint of mes installation in sector a, b, d under ge (a) no 1 in army area jodhpur.
Repair and maint of mes installation in sector a, b, d under ge (a) no 1 in army area jodhpur.
Read moreRefurbishment/repairing of existing 3-phase induction motor 270 hp vide motor serial no (kirloskar) and supply, installation of mounting and accessories at water lifting station stage 1st near khree sultancho stadium biamathang kargil. (under re-act
Refurbishment/repairing of existing 3-phase induction motor 270 hp vide motor serial no (kirloskar) and supply, installation of mounting and accessories at water lifting station stage 1st near khree sultancho stadium biamathang kargil. (under re-act
Read moreErection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrrangement at topa ocp under kuju area.
Erection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrangement at topa ocp under kuju area.
Read moreof your Industry type