Tender Details

Particulars Details
Title
Shifting Of 11 Kv Ht Line, Lt Line And Transformer For The Work Construction Of Basantakundal Village To Kalapada Pwd Road Via Bharigol Taikana Village Road Under Mmsy Trip In The District Of Cuttack
Description
Shifting Of 11 Kv Ht Line, Lt Line And Transformer For The Work Construction Of Basantakundal Village To Kalapada Pwd Road Via Bharigol Taikana Village Road Under Mmsy Trip In The District Of Cuttack
Organisation CE RW I | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 6000
EMD 16285
Tender Value
Place Basantakundal
Link

AAAAAAAAAA

Login to view
Start Date June 23, 2025 17:30
End Date

02/07/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Const of 1 no 66kv line bay at 66kv s/s hsp road phagwara under rdss

Construction of additional foundations for 1no. 66kv line bay and allied civil works like trenches, gravel spreading at 66kv s/s hoshiarpur road phagwara (under op. circle jalandhar) (twl no. 165/nz/2023-24/annex-e) under rdss

Read more
Construction of new shed for culinary, automated beverage and pet bottling unit in plant of pagrexco from foundation work to steel structure civil work including partition providing joinery and public health services etc distt hoshiarpur hsp_2025_030

Construction of new shed for culinary, automated beverage and pet bottling unit in plant of pagrexco from foundation work to steel structure civil work including partition providing joinery and public health services etc distt hoshiarpur hsp_2025_030

Read more
Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).

Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise