Tender Details
Particulars | Details |
---|---|
Title |
Removal Of Spillage Coal From All Trunk Belt Of G Iii Bottom Seam And G Ii A Seam Of Bagdewa Ug Mine.
|
Description |
Removal Of Spillage Coal From All Trunk Belt Of G Iii Bottom Seam And G Ii A Seam Of Bagdewa Ug Mine.
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_SECL_286165_1 |
Reference Number |
SECL/KB/GM/SO(M)/eNIT/23-24/20 |
Tender Fee | |
EMD | 31300 |
Tender Value | |
Place | Office of the General Manager Korba Area Post and |
Link | https://coalindiatenders.nic.in |
Start Date | August 17, 2023 16:30 |
End Date |
28/08/2023 ( Expired 646 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRound the clock picking, removal of stones, shales, iron pieces and other foreign materials from running coal conveyor belts and at metal detector of coal handling plant, ptpp, parichha
Round the clock picking, removal of stones, shales, iron pieces and other foreign materials from running coal conveyor belts and at metal detector of coal handling plant, ptpp, parichha
Read moreAnnual work of cleaning and removal of material like vegetation, debris, shrub, khajji and fodder weed etc from raw water reservoir stage-ii at sstpp, mppgcl, dongalia distt. khandwa.
Annual work of cleaning and removal of material like vegetation, debris, shrub, khajji and fodder weed etc from raw water reservoir stage-ii at sstpp, mppgcl, dongalia distt. khandwa.
Read moreRepair replacement of all sanitary fitting plumbing works and water proofing including misc works at zone iii and zone iv under age br ii of ge nagrota
Repair replacement of all sanitary fitting plumbing works and water proofing 
 including misc works at zone iii and zone iv under age br ii of ge nagrota
Read moreConstruction of 50 nos. ventilation stoppings by ccsb for smooth ventilation of iii seam and vb2 seam at vishnupuri underground mine no. ii of pench area
Construction of 50 nos. ventilation stoppings by ccsb for smooth ventilation of iii seam and vb2 seam at vishnupuri underground mine no. ii of pench area
Read moreTtps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Ttps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Ttps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Read moreConstruction of 20 nos of rcc sectionalization and 20 nos of rcc isolation stoppings in panel b28 b29 b30 b31 and b3 b4 b5 b37 b36 in seam vib at khairaha ug mine
Construction of 20 nos of rcc sectionalization and 20 nos of rcc isolation stoppings in panel b28 b29 b30 b31 and b3 b4 b5 b37 b36 in seam vib at khairaha ug mine
Read moreConstruction of 05 nos of rcc sectionalization stopping in vi bottom seam at bangwar ug mine
Construction of 05 nos of rcc sectionalization stopping in
 vi bottom seam at bangwar ug mine
Read moreof your Industry type