Tender Details
Particulars | Details |
---|---|
Title |
Removal Of Spillage Coal From The Tb 1, Tb 2, Tb 3, 31 Le 1st And 2nd Belt, 30 Le Belt And 61 D/30 Le Belt Road Way In G Iii Bottom Seam At Singhali Ug Mine.
|
Description |
Removal Of Spillage Coal From The Tb 1, Tb 2, Tb 3, 31 Le 1st And 2nd Belt, 30 Le Belt And 61 D/30 Le Belt Road Way In G Iii Bottom Seam At Singhali Ug Mine.
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_SECL_287293_1 |
Reference Number |
SECL/KB/GM/SO(M)/eNIT/23-24/21 |
Tender Fee | |
EMD | 39300 |
Tender Value | |
Place | Office of the General Manager Korba Area Post and |
Link | https://coalindiatenders.nic.in |
Start Date | August 29, 2023 16:30 |
End Date |
08/09/2023 ( Expired 611 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Read moreUpgradation of rural road from nh connection (near webi junction) to nh connection (near bamboo nalah pahalgaon-1) at mayabunder, north and middle andaman under pmgsy-iii, batch-i,2024-25 package no. an03mb308 (length 3.100 km).
Upgradation of rural road from nh connection (near webi junction) to nh connection (near bamboo nalah pahalgaon-1) at mayabunder, north and middle andaman under pmgsy-iii, batch-i,2024-25 package no. an03mb308 (length 3.100 km).
Read moreHiring of 1 no skilled wcl l1 services at ps 3 dispensary to carry out various misc jobs such as assistance in maintenance of records and assistance in other day to day office jobs for a period of four years from 01 07 2025 to 30 06 2029
Hiring of 1 no skilled wcl l1 services at ps 3 dispensary to carry out various misc jobs such as assistance in maintenance of records and assistance in other day to day office jobs for a period of four years from 01 07 2025 to 30 06 2029
Read moreConstruction work of interlocking road and covered drain from the house of gagga naimi to the house of mohd arif in ward nalapar dakshini 2/3
Construction work of interlocking road and covered drain from the house of gagga naimi to the house of mohd arif in ward nalapar dakshini 2/3
Read moreRenovation of iei to 04 nos. type i qtrs. g block bearing nos. g 1, g 2, g 3 and g 4 at fire service head quarter complex, supply line, port blair
Renovation of iei to 04 nos. type i qtrs. g block bearing nos. g 1, g 2, g 3 and g 4 at fire service head quarter complex, supply line, port blair
Read moreInfrastructure development of various place in khaltsi sub division in lieu of hh chetsang rinpochey visit. (by way of gsb,wmm,bm and ogpcin km 1st to 2nd) at tar). under distt. plan
Infrastructure development of various place in khaltsi sub division in lieu of hh chetsang rinpochey visit. (by way of gsb,wmm,bm and ogpcin km 1st to 2nd) at tar). under distt. plan
Read moreConstruction of siltation chamber and leach pit 5 nos 1 near charkhi bus-stand 2 near charkhi primary school 3 at baranda chakrabortty para 4 near teora main road 5 near maliha dighi par. under billeswar g.p.
Construction of siltation chamber and leach pit 5 nos 1 near charkhi bus-stand 2 near charkhi primary school 3 at baranda chakrabortty para 4 near teora main road 5 near maliha dighi par. under billeswar g.p.
Read moreClearing of waterways and removal of blockages of nallah in ward no. 1, 2, 3 and 4 of fatorda constituency.
Clearing of waterways and removal of blockages of nallah in ward no. 1, 2, 3 and 4 of fatorda constituency.
Read moreZone no. 04, ward no. 44, construction work of rcc drain and culvert in mahajan tola 1. from shri abhay mishra house to shri umesh patel and sudhir singh gaddi road 2. through mahajan tola to shri rajesh chaturvedi gaddi road 3. to shri govind...
Zone no. 04, ward no. 44, construction work of rcc drain and culvert in mahajan tola 1. from shri abhay mishra house to shri umesh patel and sudhir singh gaddi road 2. through mahajan tola to shri rajesh chaturvedi gaddi road 3. to shri govind...
Read moreTransport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Transport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Read moreof your Industry type