Tender Details
Particulars | Details |
---|---|
Title |
Stator Frame Fabricated Cum Machining 1,Stator Frame Fabricated Cum Machining 2,Stator Frame Fabr
|
Description |
|
Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | 2 Crore |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 31, 2025 15:51 |
End Date |
21/06/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read morePrototype 1,prototype 2,prototype 3,prototype 4,prototype 5,bulk 1,bulk 2,bulk 3,bulk 4,bulk 5
Read more
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreAccess control system_item 1,access control system_item 2,access control system_item 3,access contr
Read more
Sitc of bed cum passenger lift at ipd building_ opd building_ 2 nos mo quarter and 2 nos nurse quarter buildings
Construction of infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds at kaliyaganj in the district of uttar dinajpur - sitc of bed cum passenger lift at ipd building, opd building-2nos mo quarter and 2nos quarter
Read moreTitle 1,title 2,title 3,title 4,title 5,title 6,title 7,title 8,title 9,title 10,title 11,title 12,
Read more
Engineering, procurement and construction and operation and maintenance contract (lump-sum cum item rate)of advait lok (acharya shankar museum complex and parking) (epc-2) at omkareshwar, district khandwa, madhya pradesh, india
Engineering, procurement and construction and operation and maintenance contract (lump-sum cum item rate)of advait lok (acharya shankar museum complex and parking) (epc-2) at omkareshwar, district khandwa, madhya pradesh, india
Read moreof your Industry type