Tender Details
Particulars | Details |
---|---|
Title |
Total Bile Acids Reagent Kit
|
Description |
|
Organisation | NA | Ministry of Labour and Employment |
Tender Id | GEM/2024/B/5244792 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | September 18, 2024 16:08 |
End Date |
09/10/2024 ( Expired 219 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Read moreKit for estimation of hdl,kit for estimation of cholesterol,kit for estimation of glucose,kit for e
Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreCustom bid for services - total cost of three years comprehensive amc of hardware items in database
Read more
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreof your Industry type