Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Road Side Rain Water Harvesting System (With 3 Years O And M) Near Ambedkar Circle, Alwar. Nit28/2024 25/Item10
|
Description |
Construction Of Road Side Rain Water Harvesting System (With 3 Years O And M) Near Ambedkar Circle, Alwar.
|
Organisation | UIT -Alwar-Secretary | State Govt. and UT |
Tender Id | 2025_UITAL_453753_1 |
Reference Number |
NIT28/2024-25/Item10 |
Tender Fee | 1000 |
EMD | 14800 |
Tender Value | |
Place | UIT ALWAR |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=814439 |
Start Date | March 20, 2025 18:30 |
End Date |
02/04/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Read moreWater supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0
Water supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreP, l, j, testing and comm. of pipe line for rising main, cons. and comm. of reservoirs and pumping system, source and ancillary works with o and m of the system for 5 years for 21 villages of kgbas block and 01 urban town kishangarhbas
P, l, j, testing and comm. of pipe line for rising main, cons. and comm. of reservoirs and pumping system, source and ancillary works with o and m of the system for 5 years for 21 villages of kgbas block and 01 urban town kishangarhbas
Read moreHiring of 02 nos. each truck mounted mist cannon system and truck mounted road sweeper system along with manpower for period of three years at dpa
Hiring of 02 nos. each truck mounted mist cannon system and truck mounted road sweeper system along with manpower for period of three years at dpa
Read moreConstruction of flood protection wall, rain water harvesting, ramps at 66 kv s/s bajeke under o and m division fazilka
Construction of flood protection wall, rain water harvesting, ramps at 66 kv s/s bajeke under o and m division fazilka
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read moreWork of drinking wsp for 212 villages 77 villages of sabla block and 135 villages of sagwara block including their 255 oh and 1 town sagwara of district dungarpur from beneshwar anicut under jjm with o and m for 10 years after dlp of 1year
Work of drinking wsp for 212 villages 77 villages of sabla block and 135 villages of sagwara block including their 255 oh and 1 town sagwara of district dungarpur from beneshwar anicut under jjm with o and m for 10 years after dlp of 1year
Read moreEmergent repair of rcc pipe 1 m internal dia np3 laid for drainage of the surrounding flooded water during heavy rain at rd 62250 right side ubdc hydel channel near village kataruchak
Emergent repair of rcc pipe 1 m internal dia np3 laid for drainage of the surrounding flooded water during heavy rain at rd 62250 right side ubdc hydel channel near village kataruchak
Read moreConstruction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Read moreof your Industry type