Site Survey, Design, Engineering, Supply, Installation, Testing And Commissioning Of 475 K Wp Solar Pv
|
| Description |
Site Survey, Design, Engineering, Supply, Installation, Testing And Commissioning Of 475 K Wp Solar Pv
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_IITB_758555_1 |
|
Reference Number |
01/IITBhilai/ Estate/2023-24 |
| Tender Fee | 500 |
| EMD | 5.23 Lakh |
| Tender Value | - |
| Place | IIT BHILAI SEJBAHAR CAMPUS |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | June 21, 2023 00:05 |
| End Date |
Expired
03/08/2023
Expired 1143 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Survey, investigation, design, supply, erection, testing and commissioning of lis for supplementing water to suffering atchkat of 3997ha of d 76 of tlbc by lifting water from tungabhadra river near yedival village of manvi taluk, raichur district on turnkey basis, phase i
Work comprising of construction of intake structure, jack well cum pumphouse, pumping machineries (2 pumps), 33/6.6kv electrical substation with power transformer, 33kv transmission line, 110/33kv transformer bay with 33kv terminal bay, rising main including supply of spare parts and tools, o and m for five years after successful commissioning of the entire scheme on turnkey basis
Read moreDesign, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Read moreDesign, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreSupply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit
Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit
Read moreSurvey design fabrication supply installation testing commissioning of total 40 kwp on grid connected rooftop solar pv power plant
Survey design fabrication supply installation testing commissioning of total 40 kwp on grid connected rooftop solar pv power plant t including comprehensive maintenance contract for 5 years
Read moreSurvey design fabrication supply installation testing and commissioning of grid connected solar pv
Read more
Survey design fabrication supply installation testing and commissioning of grid connected solar pv
Read more
Survey design fabrication supply installation testing and commissioning of total 91.67 kwp of on grid connected rooftop solar pv power plant
Survey design fabrication supply installation testing and commissioning of total 91.67 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 3 years
Read moreSurvey design fabrication supply installation testing and commissioning of total 47.19 kwp of on grid connected rooftop solar pv power plant
Survey design fabrication supply installation testing and commissioning of total 47.19 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 3 years