Tender Details

Particulars Details
Title
Conducting Final Location Survey With Hybrid Modern Survey Technology Using Dgps Integrated Rtk/Ppk Uas Drone (Npnt Compliant From Dgca) Based Photogrammetric And Lidar System, Conducting Soil Investigation &Amp Preparation And Submission Of Various Detailed Drawings And Preparation Of Estimate And Dpr Of New Line Between Gadchiroli To Bacheli Via Bijapur (490.0 Km) Section Of South East Central Railway.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 77799081
Reference
Number
CEC-NGP-24-25-07
Tender Fee 0
EMD 7.26 Lakh
Tender Value -
Place Bilaspur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77799081/viewNitPdf_4734441.pdf

Start Date October 07, 2024 22:00
End Date
Expired 05/11/2024

Expired 710 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).

Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).

Read more
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri

Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)

Read more
Rate contract for conducting survey contouring preparation of detailed dpr and digital layout for development and plotting at different sites of proposed industrial estates in various districts of jammu province of jk ut

Rate contract for conducting survey contouring preparation of detailed dpr and digital layout for development and plotting at different sites of proposed industrial estates in various districts of jammu province of jk ut

Read more
Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro

Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro

Read more
Preparation of photogrammetric survey plan of

Preparation of photogrammetric survey plan of the centrally protected monuments / sites covering protected, prohibited and regulated areas under archaeological survey of india, mumbai circle (2023-24)

Read more
Conducting detailed survey and preparation

Conducting detailed survey and preparation of all necessary documents for assessment of and compensationalongtransmissioncorridorfortheworkerectionof110kvmcdclineonarasurpalladamfeedererectionof110kvdclinetowerarasursulurfeeder230kvscline edayarpalam

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise