Tender Details
Particulars | Details |
---|---|
Title |
Conducting Final Location Survey With Hybrid Modern Survey Technology Using Dgps Integrated Rtk/Ppk Uas Drone (Npnt Compliant From Dgca) Based Photogrammetry And Lidar System Conducting Soil Investigation &Amp Preparation And Submission Of Various Detailed Drawings And Preparation Of Estimate And Dpr For Gadchiroli Mulmarao/ Kelzar Connectivity New Line (Aprox. 128 Kms)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72967746 |
Reference Number |
CPM-GSU-20-NGP-2023-24 |
Tender Fee | 0 |
EMD | 2.81 Lakh |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022024/72967746/viewNitPdf_4447307.pdf |
Start Date | January 09, 2024 00:31 |
End Date |
02/02/2024 ( Expired 466 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Conducting preliminary and detailed survey geotechnical investigation designing estimation preparation of different drawings required for preparation of fsr dpr and obtaining its approval from railways and proof checking of drawings required for cons
Conducting preliminary and detailed survey geotechnical investigation designing estimation preparation of different drawings required for preparation of fsr dpr and obtaining its approval from railways and proof checking of drawings required for cons
Read moreDrone based photogrammetry and dgps survey and investigation, design, drawing and preparation of dpr for patne dam and micro irrigation network for cca 135000 ha. in panna district proposed under ken-betwa link project
Drone based photogrammetry and dgps survey and investigation, design, drawing and preparation of dpr for patne dam and micro irrigation network for cca 135000 ha. in panna district proposed under ken-betwa link project
Read moreConducting final location survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of construction of double line fly over/ror at lajkura(10 km) in s.e.c. railway.
For complete deion and other details, please refer to tender
Read moreConducting feasibility study, investigation, detailed survey with dgps /total station, marking of alignment, soil investigation, preparation of gad and submission of dpr for construction of rob/rub in lieu of total 13 lcs over gnt division. sw1:: . gnt -kcc section: 01 no. of lc (4) sw2 :: 12 no. of lcs gnt-ndkd section (4 ) : 6, 27, 40, 81, gnt-tel section (1) : 2a, gnt-ndl section (4) : 312, 181, 184, 206 and gnt-kcc section ( 3) 2,3 and 14
For complete deion and other details, please refer to tender
Read moreConducting final location survey,traffic survey submission of comprehensive dpr for all civil, electrical and s&t work preparation of detail estimate alongwith alignment plan, yard plan , drawing for minor bridges, major bridges, rob/rub, fob , level crossing drawings , hydrological & geotechnical investigation and all other ancillary works, preparation & submission of epc tender document for all works including eletrical, trd and s&t for : (a) pirpainti by-pass line connectin
For complete deion and other details, please refer to tender
Read moreConducting final location survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of new line between korba-ambikapur (180 km) in s.e.c. railway.
For complete deion and other details, please refer to tender
Read moreConducting final location survey with hybrid modern survey technology using dgps integrated rtk/ppk uas drone (npnt compliant from dgca) based photogrammetric and lidar system, conducting soil investigation & preparation and submission of various detailed drawings and preparation of estimate and dpr of new line between gadchiroli to bacheli via bijapur (490.0km) section of south east central railway.
For complete deion and other details, please refer to tender
Read moreWork of final location survey for bamhrauli- shujatpur including preparation of drawings, detailed cost estimate & bill of quantities(boq), land acquisition estimation along-with other ancillary activities by carrying out detailed topographical survey and setting up a complete 3d photogrammetry and dtm(digital terrain models) using modern survey technologies like lidar/dgps based integrated drone etc and autocad system in connection with 4th line between bamhrauli- shujatpur 4
For complete deion and other details, please refer to tender
Read moreConducting final location survey including preparation of dpr as per latest railway board guidelines, involving modern survey techniques e.g. airborne or terrestrial lidar and/or drone photogrammetry for linear projects of railways. geotechnical investigation, signalling works, electrical works & operating work for construction of 4th line/ flyover line/ byepass line (1) khana-sainthia 4th line (84.10km). (ii) masagram flyover (5 km). (iii) katwa by-pass connecting bardhanman-katwa single
For complete deion and other details, please refer to tender
Read moreConducting final location survey,traffic survey submission of comprehensive dpr for all civil, electrical and s&t work preparation of detail estimate alongwith alignment plan, yard plan , drawing for minor bridges, major bridges, rob/rub, fob , level crossing drawings , hydrological & geotechnical investigation and all other ancillary works, preparation & submission of epc tender document for all works including electrical, trd and s&t for jasidih - dumka double line (71.58 km
For complete deion and other details, please refer to tender
Read moreof your Industry type