Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Resurfacing Of Skara Olthang Road Rd 0 To 610 M By Way Of 2.5 Cm Ogpc Including Speed Breaker
|
Description |
Resurfacing Of Skara Olthang Road Rd 0 To 610 M By Way Of 2.5 Cm Ogpc Including Speed Breaker
|
Organisation | Union Territory of Ladakh |
Tender Id | 2023_PWD_11155_3 |
Reference Number |
E Tender 136 of R and B Division Leh |
Tender Fee | 1000 |
EMD | 34180 |
Tender Value | |
Place | Office of the Executive Engineer RnB Division Leh |
Link | https://tenders.ladakh.gov.in |
Start Date | September 21, 2023 15:30 |
End Date |
11/10/2023 ( Expired 626 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreConst of 41.90 m span bridge 5-span 8.38m each at rd 1665 m on link road tr 08 kheowali dhab to kabulshah to ramkot to sugar mill nh 07 widening of existing bridge under pmgsy iii batch -3 year 2024-25 district fazilka package no pb-19-313 a
Const of 41.90 m span bridge 5-span 8.38m each at rd 1665 m on link road tr 08 kheowali dhab to kabulshah to ramkot to sugar mill nh 07 widening of existing bridge under pmgsy iii batch -3 year 2024-25 district fazilka package no pb-19-313 a
Read moreImprovement of gogamukh to ghilamara road (sh-22) by providing 100 m length causeway at ch. 19875 m under sdmf for the year 2023-24 in lakhimpur district.
Improvement of gogamukh to ghilamara road (sh-22) by providing 100 m length causeway at ch. 19875 m under sdmf for the year 2023-24 in lakhimpur district
Read moreContruction of road from baparam dutta pwd to laukuth tiniali via leluwani from ch. 0 m to ch. 2000 m by panelled concrete technology under sdmf for the year 2024-25 in lakhimpur district.
Contruction of road from baparam dutta pwd to laukuth tiniali via leluwani from ch. 0 m to ch. 2000 m by panelled concrete technology under sdmf for the year 2024-25 in lakhimpur district.
Read moreConstruction of road from batomari tiniali to chiring gaon from ch. 0 m to ch. 1670 m by cell filled concrete technology under sdmf for the year 2024-25 in lakhimpur district.
Construction of road from batomari tiniali to chiring gaon from ch. 0 m to ch. 1670 m by cell filled concrete technology under sdmf for the year 2024-25 in lakhimpur district.
Read moreConstruction of random rubble masonry retaining wall with synthetic geogerids on kekuri pamua to nayabazar road from ch. 0 m to ch. 352 m under sdmf for the year 2024-25 in lakhimpur district.
Construction of random rubble masonry retaining wall with synthetic geogerids on kekuri pamua to nayabazar road from ch. 0 m to ch. 352 m under sdmf for the year 2024-25 in lakhimpur district.
Read moreImprovement of road from namoni khamon tiniali to sarbodaya school (from ch. 0 m to ch. 1000m) by cell filled concrete technology under sdmf for the year 2024-25 in lakhimpur district.
Improvement of road from namoni khamon tiniali to sarbodaya school (from ch. 0 m to ch. 1000m) by cell filled concrete technology under sdmf for the year 2024-25 in lakhimpur district.
Read moreUpgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in 1 year defect liability period and 4 year maintenance period
Upgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in which 1 year defect liability period and 4 year maintenance period
Read moreMacadamization of road from manohar galla to kassi swari by way of providing and laying wbm grade 2nd 75mm thick in one layer, wbm grade 3rd, 20mm thick premix carpet over 50mm thick bm in km 1st rd 0 to km 2nd rd 200 length 1.2 km
Macadamization of road from manohar galla to kassi swari by way of providing and laying wbm grade 2nd 75mm thick in one layer, wbm grade 3rd, 20mm thick premix carpet over 50mm thick bm in km 1st rd 0 to km 2nd rd 200 length 1.2 km
Read moreLaying of vdcc road h.no.214-7321/73 and turabi hotel to m mart and general store to h.no.21-4-890 in tharki manden galli charminar assembly constituency. proposed by hon ble mla charminar assembly constituency under sdf- 2023-24
Laying of vdcc road h.no.214-7321/73 and turabi hotel to m mart and general store to h.no.21-4-890 in tharki manden galli charminar assembly constituency. proposed by hon ble mla charminar assembly constituency under sdf- 2023-24
Read moreof your Industry type