| Particulars | Details |
|---|---|
| Title |
The Work Plan Of Rs. 07.50 Cr. For System Strengthening Under The Additional Bp 2023 24 In Edd Iii, Sakaldiha, 33k V Feeder Lines To 33 11k V Sub Station Through Gsm Cable (3x300sqmm) 1.5 Km Work Of Connecting 33 Kv Line Of Ramauli On Semi Turn Key Basi
|
| Description |
The Work Plan Of Rs. 07.50 Cr. For System Strengthening Under The Additional Bp 2023 24 In Edd Iii, Sakaldiha, 33k V Feeder Lines To 33 11k V Sub Station Through Gsm Cable (3x300sqmm) 1.5 Km Work Of Connecting 33 Kv Line Of Ramauli On Semi Turn Key Basi.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNV_838288_1 |
|
Reference Number |
45/EDC(C)/2023-24 |
| Tender Fee | 1180 |
| EMD | 7500 |
| Tender Value | - |
| Place | Chandauli |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 15, 2023 14:30 |
| End Date |
Expired
25/09/2023
Expired 1114 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Add. bp 2023-24 in edd-iii, sakaldiha work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line on semi turn-key basis
Add. bp 2023-24 in edd-iii, sakaldiha work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line on semi turn-key basis
Read moreWork plan of rs. 07.50 cr. system strengthening under the add. bp 2023-24 in edd-ii, mughalsarai include installation of add. converter and capacity increase, double circuiting, line, other station related. on semi turn-key basis.
Work plan of rs. 07.50 cr. system strengthening under the add. bp 2023-24 in edd-ii, mughalsarai include installation of add. converter and capacity increase, double circuiting, line, other station related. on semi turn-key basis.
Read moreAdd. bp 2023-24 in edd-i, chandauli work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line. on semi turn-key basis.
Add. bp 2023-24 in edd-i, chandauli work plan of rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated abc cable dilapidated wire installed on lt line. on semi turn-key basis.
Read moreof your Industry type