Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Khungring Nareng Nala Flow I Scheme Under Sopd For The Year 2022 23under Sidli Division Irrigation
|
| Description |
Construction Of Canal Regulators 2 Nos, Construction Of U/S Afflux Bund , D/S Guide Bund, Constn Of Earthen Canal, Rcc Lined Canal, Village Road Crossing Culverts 2 Nos, Cattle Crossing Culverts 3 Nos ,Improvement Of Approach Road Etc.
|
| Organisation | Government of Assam |
| Tender Id | 2023_ID_31743_1 |
|
Reference Number |
20 _SOPD_2023-24 Date_17_07_2023 |
| Tender Fee | 6000 |
| EMD | 5.75 Lakh |
| Tender Value | - |
| Place | E-Tendering Cell, O_O the CE Irrig. Assam, Ghy-03 |
| Link |
View Original Tender Notice
https://assamtenders.gov.in |
| Start Date | July 24, 2023 15:30 |
| End Date |
Expired
16/08/2023
Expired 1155 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of nala from aryanagar chowk to lal mandir colony along left side of road and aryanagar chowk to sewer pumping station along right side of road
Strengthening of nala from aryanagar chowk to lal mandir colony along left side of road and aryanagar chowk to sewer pumping station along right side of road
Read moreGeneral-action plan 2026- 27 - annual maintenance-jungle clearance and removing floating body for the smooth flow of water during water distribution in pallickal anayadi thottuva distributory
General-action plan 2026- 27 - annual maintenance-jungle clearance and removing floating body for the smooth flow of water during water distribution in pallickal anayadi thottuva distributory
Read moreConstruction of protection wall near the house of nandu dalvi on yelpai nala at ghotage - yelpaiwadi
Construction of protection wall near the house of nandu dalvi on yelpai nala at ghotage - yelpaiwadi
Read moreGeneral action plan 2026 27 annual maintenance jungle clearance and removing floating body for smooth flow of water during water distribution in vallikunnam distributory from 0m to 6777m general civil work
General action plan 2026 27 annual maintenance jungle clearance and removing floating body for smooth flow of water during water distribution in vallikunnam distributory from 0m to 6777m general civil work
Read moreGeneral action plan 2026 27 annual maintenance jungle clearance and removing floating body for the smooth flow of water during water distribution in sasthakulam distributory from ch 0 00m to 6850m general civil work
General action plan 2026 27 annual maintenance jungle clearance and removing floating body for the smooth flow of water during water distribution in sasthakulam distributory from ch 0 00m to 6850m general civil work
Read moreRepair of 02 no. 50 cs. vt axial flow pump at ph nld-3 (p-3) and ph nld-4 (p-3) of nolpur disty having lift 22.97 feet in w.s mech. sub division no.2, narnaul
Repair of 02 no. 50 cs. vt axial flow pump at ph nld-3 (p-3) and ph nld-4 (p-3) of nolpur disty having lift 22.97 feet in w.s mech. sub division no.2, narnaul
Read moreStrengthening of nala in north haridwar from madhu palace, rishikesh road to sadguru ghisaram darbar and from hill bypass water tank to bhimgoda
Strengthening of nala in north haridwar from madhu palace, rishikesh road to sadguru ghisaram darbar and from hill bypass water tank to bhimgoda
Read moreConstruction of silghagri_khanipur flow i_scheme under ridf_xxviii_nabard_ for the year 2022_23 under sidli division_i_ dhaligaon
Construction of silghagri_khanipur flow i_scheme under ridf_xxviii_nabard_ for the year 2022_23 under sidli division_i_ dhaligaon
Read moreRenovation of singua flow i_scheme under sopd for the year 2022_23 under boko chaygaon division irrigation
Strengthening_ resectioning of earthen canal c1dl from ch.0-1260m, canal c2dl ch.0-250m, c.c. lining of canal c1dl ch.0-250m, c.c. lining of canalc2dl ch.0-557m _ch.570-837.2m, constn of cattle crossing-2nos, canal outlets-36nos, repairing etc.
Read moreImprovement of canal system of uttar darogachuba flow i_scheme under sopd for the year 2022_23 under paneri kalaigaon division irrigation
Resectioning of canal system, constn of 6m spun rcc culvert_1 unit, constn of 4m spun cattle an cart crossing culvert_1 unit, constn of cattle crossing5nos, ber barrier 2 nos, rcc precast slab 5 nos, pvc canal outlets 12 nos, etc
Read moreof your Industry type