Tender Details
Particulars | Details |
---|---|
Title |
Operation And Maintenance Of Bandar Canal Bundgreenery(from Water Edge To Road Edge) From American Hospital Bridge To Nethaji Bridge(760ts) In Circle03 Area For The Period Of 12 Months(2025 226)
|
Description |
Operation And Maintenance Of Bandar Canal Bund Greenery (From Water Edge To Road Edge) From American Hospital Bridge To Nethaji Bridge (760 Mts) In Circle 3 Area For The Period Of 12 Months(2025 2026).
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 813572 |
Reference Number |
E Procurement Notice No. 06 /VMC/CDB/2024-25, Dt. 16- 05 -2025. Rc.E3.PD3(Parks)-108515/2025 |
Tender Fee | 230 |
EMD | 6500 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | May 22, 2025 23:00 |
End Date |
28/05/2025 ( Expired 10 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreRfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&#x0d compatibility (emc) testing facility in&#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&#x0d
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreLac-ads-providing paving of tiles in anganavadi varnamnagar-improvements to aganavadi varnamnagar road in ward 19 of edathala grama panchayath.-general civil work
Very&#x0d pathetic condition due to waterlogged area .this&#x0d estimate is proposed to upgrade the road&#x0d with 100 mm interlocking tile works and&#x0d provisions for earth filling, gsb, wmm,pcc ,&#x0d dr masonary and naming board are inluded in&#x0d this estimate.
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreof your Industry type