Tender Details

Particulars Details
Title
(1)improvement Of Lhs/Rub By Drainage System,Road Surface Repairs,Painting Of Ht Gauge, Desilting Etc At Various Lhs 54,98 Etc Under The Jurisdiction Of Aden/Cwa, (2) Improvement Of Lhs/Rub By Drainage System, Road Surface Repairs,Painting Of Ht Gauge, Desilting Etc At Various Lhs 235,289,71,52 Under The Jurisdiction Of Aden/Cwa &Amp (3) Improvement Of Lhs/Rub By Drainage System, Road Surface Repairs,Painting Of Ht Gauge, Desilting Etc At Various Lhs 308,274,282,284 Etc Under The Jurisdiction
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78774198
Reference
Number
N-33-NGP-2024-2025
Tender Fee 0
EMD 2.66 Lakh
Tender Value -
Place Bilaspur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78774198/viewNitPdf_4792017.pdf

Start Date December 16, 2024 23:59
End Date
Expired 10/01/2025

Expired 644 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.

Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.

Read more
Miscellaneous p.way work for maintenance of track under sse(p.way)/chhindwara for the period of 12 months under the jurisdiction of aden/cwa.

Miscellaneous p.way work for maintenance of track under sse(p.way)/chhindwara for the period of 12 months under the jurisdiction of aden/cwa.

Read more
Provision of height gauge and provision of rubberized surface under the jurisdiction of den central ckp

Provision of height gauge and provision of rubberized surface under the jurisdiction of den central ckp

Read more
Provision of height gauge and provision of rubberized surface under the jurisdiction of den central ckp

Provision of height gauge and provision of rubberized surface under the jurisdiction of den central ckp

Read more
Improvement to road surface at high road traffic lcs with rubberized road surface at 04 lcs (c-16, 18,25 & 29) in the jurisdiction of aden/luni over jodhpur division

Improvement to road surface at high road traffic lcs with rubberized road surface at 04 lcs (c-16, 18,25 & 29) in the jurisdiction of aden/luni over jodhpur division

Read more
Combined tender-(a) ddu-pryj:- improvement of rub/lhs no. 09, 14, 16, 25, 1c, 120c, 123c, 124c for protection from water seepage works under sr. den/i/pryj.(b) car-cpu:- improvement of rub/lhs no. 9c, 14c, 20c, 21c, 22c, 120a & 85b for protection from water seepage and other miscellaneous works under aden/car.

Combined tender-(a) ddu-pryj:- improvement of rub/lhs no. 09, 14, 16, 25, 1c, 120c, 123c, 124c for protection from water seepage works under sr. den/i/pryj.(b) car-cpu:- improvement of rub/lhs no. 9c, 14c, 20c, 21c, 22c, 120a & 85b for protection from water seepage and other miscellaneous works under aden/car.

Read more
Improvement of drainage system. s.h. desilting of rcc covered kushak nallah and ring road nallah under jurisdiction of r-iii division

Improvement of drainage system. s.h. desilting of rcc covered kushak nallah and ring road nallah under jurisdiction of r-iii division

Read more
Raising of bed, improvement of drainage arrangements, joints treatment of lhs & approach of lhs no. 69-a, 69-c, 74-a & 78-a on jhl-hsr section in the section of sse/w/sag under aden/pta.

Raising of bed, improvement of drainage arrangements, joints treatment of lhs & approach of lhs no. 69-a, 69-c, 74-a & 78-a on jhl-hsr section in the section of sse/w/sag under aden/pta.

Read more
(1) comprehensive drainage study using modern survey technologies and submission of design and drawing for gondia and amgaon yard under the jurisdiction of aden/gondia. (2) comprehensive drainage study using modern survey technologies and submission of design and drawing for dgg, rsm, mua & rjn yard under the jurisdiction of aden/dongargarh (dgg).

(1) comprehensive drainage study using modern survey technologies and submission of design and drawing for gondia and amgaon yard under the jurisdiction of aden/gondia. (2) comprehensive drainage study using modern survey technologies and submission of design and drawing for dgg, rsm, mua & rjn yard under the jurisdiction of aden/dongargarh (dgg).

Read more
Open e-tender for the work of removal of infrastructure deficiency of limited height subway at lhs no. 20, 24,30, 32 and lhs at km 396/1-2 injecting various grouting, drainage improvement, cross drain, height gauge and other ancillary works under assistant engineer/line/ jamalpur in the jurisdiction of senior divisional engineer-iii/eastern railway/malda.

Open e-tender for the work of removal of infrastructure deficiency of limited height subway at lhs no. 20, 24,30, 32 and lhs at km 396/1-2 injecting various grouting, drainage improvement, cross drain, height gauge and other ancillary works under assistant engineer/line/ jamalpur in the jurisdiction of senior divisional engineer-iii/eastern railway/malda.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise