Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Abutment Wall At Sides Of Trench From Tower No. 1 To East Side Of Link Gate Wall At Efa
|
Description |
Repairing Of Abutment Wall At Sides Of Trench From Tower No. 1 To East Side Of Link Gate Wall At Efa
|
Organisation | Armoured Vehicles Nigam Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 95800 |
Tender Value | |
Place | ENGINE FACTORY AVADI |
Link |
AAAAAAAAAA Login to view |
Start Date | June 06, 2025 21:30 |
End Date |
20/06/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreCa no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Construction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Read moreConstruction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).
Construction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).
Read moreConstruction of nali from balmukund shukla house to narendra patel house both side of road at ward no 05 pithampur
Construction of nali from balmukund shukla house to narendra patel house both side of road at ward no 05 pithampur
Read moreRising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type