Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fdr/Mtc. Of Road From Kma Road Near Bagmara Bazar To Balaram Under Ambassa Sub Division Pwd (Rand B) During The Year 2023 24 / Sh Grouting, Re Carpeting, Seal Coat And Road Side Pucca Drain Etc. At Ch. 0.00 To Ch. 0.60 Km.
|
| Description |
Fdr/Mtc. Of Road From Kma Road Near Bagmara Bazar To Balaram Under Ambassa Sub Division Pwd (Rand B) During The Year 2023 24 / Sh Grouting, Re Carpeting, Seal Coat And Road Side Pucca Drain Etc. At Ch. 0.00 To Ch. 0.60 Km.
|
| Organisation | Government of Tripura |
| Tender Id | 2023_CEPWD_44362_1 |
|
Reference Number |
17/EE/PWD(RandB)/AMB/2023-24 |
| Tender Fee | 1000 |
| EMD | 48179 |
| Tender Value | - |
| Place | o/o the Executive Engineer,Amb-Division,PWD(RandB) |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in |
| Start Date | November 30, 2023 22:00 |
| End Date |
Expired
21/12/2023
Expired 1029 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Read moreDevelopment of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Read moreFdr protection work at nimai nath para and balaram fiii li scheme from erosion of river dhalai under wr sub division ambassa during the year 2026 27 sh protection work by providing bamboo palasiding gunny bag etc.
Fdr protection work at nimai nath para and balaram fiii li scheme from erosion of river dhalai under wr sub division ambassa during the year 2026 27 sh protection work by providing bamboo palasiding gunny bag etc.
Read moreDevelopment of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 1720 00 mtr to ch 2600 0
Development of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 1720 00 mtr to ch 2600 0
Read moreDevelopment of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 860 00 mtr to ch 1720 00
Development of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 860 00 mtr to ch 1720 00
Read moreDevelopment of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 0 00 mtr to 860 00 mtr
Development of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 0 00 mtr to 860 00 mtr
Read moreUrgent flood damage of road from kma road near bagmara baazar to dhumjakrai under ambassa sub-division,pwd(randb) (l-1.495)
Sh-soling, wbm-iii, carpeting, protection wall and drain etc.(ch. 0.50 to 1.50km and 2.50km to 2.995 km).
Read moreUrgent flood damage of road from kma road near bagmara baazar to dhumjakrai under ambassa sub-division,pwd(randb) (l-2.995 km)
Sh-soling, wbm-iii, carpeting, protection wall and drain etc.(ch. 1.50 km to 2.50 km).
Read moreMtc. of road from kma road to paijabari road via ambassa phc from ch. 2.10 km to ch. 2.60 km. during the year 2024-25/ sh- grouting, patch repairing, re-carpeting, seal coat, drain etc.
Mtc. of road from kma road to paijabari road via ambassa phc from ch. 2.10 km to ch. 2.60 km. during the year 2024-25/ sh- grouting, patch repairing, re-carpeting, seal coat, drain etc.
Read moreFdr/maintenance of kma road ing from nh-8 near ambassa townhall to ambassa railway crossing (length-0.82 km)/sh - grouting, bituminous concrete, placing interlocking paver block and road marking etc.
Fdr/maintenance of kma road ing from nh-8 near ambassa townhall to ambassa railway crossing (length-0.82 km)/sh - grouting, bituminous concrete, placing interlocking paver block and road marking etc.
Read moreof your Industry type