Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Of Kma Road To Balaram Via Iti Road (Length 5.916 Km) / Sh Metaling, Carpeting, Seal Coat, Drain, Etc.
|
| Description |
Maintenance Of Kma Road To Balaram Via Iti Road (Length 5.916 Km) / Sh Metaling, Carpeting, Seal Coat, Drain, Etc.
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_54937_1 |
|
Reference Number |
33/EE/PWD(RandB)/AMB/24-25 |
| Tender Fee | 1000 |
| EMD | 48391 |
| Tender Value | - |
| Place | Ambassa |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=55798 |
| Start Date | November 20, 2024 20:00 |
| End Date |
Expired
09/12/2024
Expired 673 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of road from khamarbari to jirkanta (l4.95km) under killa block./s.h wbm in patches, grouting, re-carpeting, seal coat and allied works etc.
Development of road from khamarbari to jirkanta (l4.95km) under killa block./s.h wbm in patches, grouting, re-carpeting, seal coat and allied works etc.
Read moreRoad development work of road from ka road to lalchari bridge approach road ( length- 0.50 km) and approach of kulai dashamighat /sh- metalling, carpeting, wearing coat of rcc bridge etc.
Road development work of road from ka road to lalchari bridge approach road ( length- 0.50 km) and approach of kulai dashamighat /sh- metalling, carpeting, wearing coat of rcc bridge etc.
Read moreDevelopment of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Read moreDevelopment of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Read moreDevelopment of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Read moreS/r to thakurpatna-duhuria road via pandiri village such as raising of depression by b.u.s.g and pot holes are repaired by pmc and seal coat from ch. 0/000km to 1/050km in the district kendrapara for the year 2026-27
S/r to thakurpatna-duhuria road via pandiri village such as raising of depression by b.u.s.g and pot holes are repaired by pmc and seal coat from ch. 0/000km to 1/050km in the district kendrapara for the year 2026-27
Read moreS/r to sh9(a) to anlabanka road -via banahara from ch.0/000km to 4/930km such as raising of depression by b.u.s.g and pot holes are repaired by pmc and seal coat in the district kendrapara for the year 2026-27
S/r to sh9(a) to anlabanka road -via banahara from ch.0/000km to 4/930km such as raising of depression by b.u.s.g and pot holes are repaired by pmc and seal coat in the district kendrapara for the year 2026-27
Read moreDevelopment of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 1720 00 mtr to ch 2600 0
Development of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 1720 00 mtr to ch 2600 0
Read moreDevelopment of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 860 00 mtr to ch 1720 00
Development of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 860 00 mtr to ch 1720 00
Read moreDevelopment of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 0 00 mtr to 860 00 mtr
Development of the road from k k road to k k road via khastila t length 2600 00 mtr under scheme for special assistance to states for capital investment for 2026 27 sh patch metalling grouting carpeting etc from ch 0 00 mtr to 860 00 mtr
Read moreof your Industry type