Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Digging Work With Earth Excavation Eighteen Inch On Plane Surface Stone,Cement Work Plasering Of Wa
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4479767 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 19, 2024 16:47 |
| End Date |
Expired
23/01/2024
Expired 996 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | ASHFAQ PHOTOSTAT | - | 21-01-2024 11:30:17 | MII MSE | Qualified |
| 2 | GHULAM HUSSAIN GOVT.CONTRACTOR | - | 23-01-2024 11:38:56 | MII MSE | Disqualified |
| 3 | HAS ENTERPRISES | - | 21-01-2024 11:46:35 | MII MSE | Qualified |
| 4 | M/S M.U.ENTERPRISES | - | 21-01-2024 11:36:41 | MII MSE | Qualified |
Crushed stone bajri,cement 50 kg bag,sand,boulder or stone,concrete ring for septic tank,floor tiles,chemical for tiles,toilet seat comode indian,pvc pipe 3inch x 10 feet,pvc bend 2 inch,pvc coller 3 inch,floor trap,aluminium door ,wire 2.5 mm 90 mtrs coil,wire 1.5 mm 90 mtrs coil,wire 1 mm 90 mtrs coil,wire 4 mm 90 mtrs coil,tap roll,exhaust fan,pvc gatti,screw 38 mm,12 watt led pannel,4 way modular plate,8 way modular plate,1 way switch 240 watt,3 pin socket,led indicator red,3mcb 32 amp sp,8 way surface down light,9 way surface down light,socket 16 amp,iron pipe 4 inch,iron pipe 4 inch and 2 inch,iron pipe 2 inch,angle iron,ply sheet 12 mm 4 feet x 8 feet,wooden gaz 2 inch x2 inch,pvc ceiling,wall panelling,wood floor,nails,colored cgi sheets 10 feet,colored cgi sheets 6 feet,ridge,self screw
Crushed stone bajri,cement 50 kg bag,sand,boulder or stone,concrete ring for septic tank,floor tiles,chemical for tiles,toilet seat comode indian,pvc pipe 3inch x 10 feet,pvc bend 2 inch,pvc coller 3 inch,floor trap,aluminium door ,wire 2.5 mm 90 mtrs coil,wire 1.5 mm 90 mtrs coil,wire 1 mm 90 mtrs coil,wire 4 mm 90 mtrs coil,tap roll,exhaust fan,pvc gatti,screw 38 mm,12 watt led pannel,4 way modular plate,8 way modular plate,1 way switch 240 watt,3 pin socket,led indicator red,3mcb 32 amp sp,8 way surface down light,9 way surface down light,socket 16 amp,iron pipe 4 inch,iron pipe 4 inch and 2 inch,iron pipe 2 inch,angle iron,ply sheet 12 mm 4 feet x 8 feet,wooden gaz 2 inch x2 inch,pvc ceiling,wall panelling,wood floor,nails,colored cgi sheets 10 feet,colored cgi sheets 6 feet,ridge,self screw
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreOfc 24 core armoured,ofc 12 core unarmoured,40mm hdpe pipe with rope,gi pipe 2 inch dia,0.6mm warning tape,coupler for hdpe conduit,cemented men hole chamber with cover,joint enclosure 24 core ofc,joint enclosure 12 core ofc,sc sc patch cord 03 mtr,lc sc patch cord,splitter,splitter,splitter,splitter,media converter,optical network unit,optical line terminal,route marker for ofc concrete rcc mile stone shape painted orange with letter afnet and cias ofc painted with red using black enamel,e pon sfp module,cias server rack,joint markers for ofc,splice ofc 24 core lc fdf,12 core fdf for sc connector fully loaded,road crossing cma culvert crossing with gi pipe,hdd digging,manual digging laying and installation and commissioning of 24 core ofc and 12 core ofc at a depth of 1.65 mtr using hdpe pipe with warning tape and back filling
Ofc 24 core armoured,ofc 12 core unarmoured,40mm hdpe pipe with rope,gi pipe 2 inch dia,0.6mm warning tape,coupler for hdpe conduit,cemented men hole chamber with cover,joint enclosure 24 core ofc,joint enclosure 12 core ofc,sc sc patch cord 03 mtr,lc sc patch cord,splitter,splitter,splitter,splitter,media converter,optical network unit,optical line terminal,route marker for ofc concrete rcc mile stone shape painted orange with letter afnet and cias ofc painted with red using black enamel,e pon sfp module,cias server rack,joint markers for ofc,splice ofc 24 core lc fdf,12 core fdf for sc connector fully loaded,road crossing cma culvert crossing with gi pipe,hdd digging,manual digging laying and installation and commissioning of 24 core ofc and 12 core ofc at a depth of 1.65 mtr using hdpe pipe with warning tape and back filling
Read moreSupply, instalation, testing, and commissioning (s/i/t/c) of electrical floor as per sl no. 01 of bo,supplying of xlpe insulated armoured, frls power cable as per sl no. 02 of boq,laying of one number pvc insulated and pvc sheathed / xlpe pc as per sl no. 03 of boq,supply and laying following size dwc hdpe pipe as per sl no. 04 of boq,dismantling manually/ by mechanical means including stacking as per sl no. 05 of boq,earth work in surface excavation as per sl no. 06 of boq,centering and shuttering including strutting as per sl no. 07 of boq,providing and laying in position cement concrete as per sl no. 08 of boq,chemical earthing with copper earth electrode as per sl no. 09 of boq,supplying and laying 25 mm x 5 mm copper strip as per sl no. 10 of boq,cement plaster 12mm of mix: 1: 6 as per sl no. 11 of boq
Supply, instalation, testing, and commissioning (s/i/t/c) of electrical floor as per sl no. 01 of bo,supplying of xlpe insulated armoured, frls power cable as per sl no. 02 of boq,laying of one number pvc insulated and pvc sheathed / xlpe pc as per sl no. 03 of boq,supply and laying following size dwc hdpe pipe as per sl no. 04 of boq,dismantling manually/ by mechanical means including stacking as per sl no. 05 of boq,earth work in surface excavation as per sl no. 06 of boq,centering and shuttering including strutting as per sl no. 07 of boq,providing and laying in position cement concrete as per sl no. 08 of boq,chemical earthing with copper earth electrode as per sl no. 09 of boq,supplying and laying 25 mm x 5 mm copper strip as per sl no. 10 of boq,cement plaster 12mm of mix: 1: 6 as per sl no. 11 of boq
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreDigging work with earth excavation eighteen inch on plane surface stone,cement work plastering of w
Read more
Digging work with earth excavation eighteen inch on plane surface stone,cement work plastering of w
Read more
Digging work with earth excavation 18 inch on plane surface stone,cement work plastering of wall an
Read more
of your Industry type