Scarifying Existing Granular Surface,Earth Work In Excavation,Cement Concrete,Random Rubble Stone M
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2023/B/3890429 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | August 30, 2023 16:38 |
| End Date |
Expired
11/09/2023
Expired 1129 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
B&B INFRAPROJECTS PRIVATE LIMITED
6974068
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | Abdul Sheed Contractor | - | 11-09-2023 14:48:38 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 2 | B&B INFRAPROJECTS PRIVATE LIMITED | - | 21-09-2023 09:56:55 | MSE | MII MSE | Qualified |
| 3 | BHARAT BUILDTECH COMPANY | - | 19-09-2023 12:51:33 | Registered with designated Agency / Authority | MII N/A | Qualified |
| 4 | NITHARWAL CONSTRUCTION | - | 11-09-2023 12:41:59 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 5 | OM PRAKASH JAT | - | 09-09-2023 12:52:08 | Registered with designated Agency / Authority | MII MSE | Qualified |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Scarifying existing granular surface | NA | BOQ Item | 7310 | ₹ 131580.000 |
| Earth work in excavation | NA | BOQ Item | 378 | ₹ 49896.000 |
| Cement Concrete | NA | BOQ Item | 59 | ₹ 174050.000 |
| Random Rubble Stone Masonry | NA | BOQ Item | 487 | ₹ 1426910.000 |
| Cement Concrete Coping | NA | BOQ Item | 208 | ₹ 92144.000 |
| Pointing on stone masonry | NA | BOQ Item | 250 | ₹ 72500.000 |
| Banking earth in layers | NA | BOQ Item | 4647 | ₹ 697050.000 |
| Supply and stacking of good quality Jhinkra | NA | BOQ Item | 2478 | ₹ 1097754.000 |
| Laying of Jhinkra | NA | BOQ Item | 620 | ₹ 37200.000 |
| Laying of Jhinkra on compacted surface | NA | BOQ Item | 930 | ₹ 32550.000 |
| Laying dry Stone soling | NA | BOQ Item | 1859 | ₹ 2650934.000 |
| Supply and stacking of good quality fine Jhinkra | NA | BOQ Item | 930 | ₹ 451050.000 |
| Laying of fine Jhinkra | NA | BOQ Item | 930 | ₹ 60450.000 |
Scarifying of existing damaged bituminous surface and laying 30 mm thick sdbc at village mauli baidwan phirni, (ward no. 26) mc sas nagar.
Scarifying of existing damaged bituminous surface and laying 30 mm thick sdbc at village mauli baidwan phirni, (ward no. 26) mc sas nagar.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreRemoving dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire
Removing dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire
Read moreCrushed stone bajri,cement 50 kg bag,sand,boulder or stone,concrete ring for septic tank,floor tiles,chemical for tiles,toilet seat comode indian,pvc pipe 3inch x 10 feet,pvc bend 2 inch,pvc coller 3 inch,floor trap,aluminium door ,wire 2.5 mm 90 mtrs coil,wire 1.5 mm 90 mtrs coil,wire 1 mm 90 mtrs coil,wire 4 mm 90 mtrs coil,tap roll,exhaust fan,pvc gatti,screw 38 mm,12 watt led pannel,4 way modular plate,8 way modular plate,1 way switch 240 watt,3 pin socket,led indicator red,3mcb 32 amp sp,8 way surface down light,9 way surface down light,socket 16 amp,iron pipe 4 inch,iron pipe 4 inch and 2 inch,iron pipe 2 inch,angle iron,ply sheet 12 mm 4 feet x 8 feet,wooden gaz 2 inch x2 inch,pvc ceiling,wall panelling,wood floor,nails,colored cgi sheets 10 feet,colored cgi sheets 6 feet,ridge,self screw
Crushed stone bajri,cement 50 kg bag,sand,boulder or stone,concrete ring for septic tank,floor tiles,chemical for tiles,toilet seat comode indian,pvc pipe 3inch x 10 feet,pvc bend 2 inch,pvc coller 3 inch,floor trap,aluminium door ,wire 2.5 mm 90 mtrs coil,wire 1.5 mm 90 mtrs coil,wire 1 mm 90 mtrs coil,wire 4 mm 90 mtrs coil,tap roll,exhaust fan,pvc gatti,screw 38 mm,12 watt led pannel,4 way modular plate,8 way modular plate,1 way switch 240 watt,3 pin socket,led indicator red,3mcb 32 amp sp,8 way surface down light,9 way surface down light,socket 16 amp,iron pipe 4 inch,iron pipe 4 inch and 2 inch,iron pipe 2 inch,angle iron,ply sheet 12 mm 4 feet x 8 feet,wooden gaz 2 inch x2 inch,pvc ceiling,wall panelling,wood floor,nails,colored cgi sheets 10 feet,colored cgi sheets 6 feet,ridge,self screw
Read moreEarth work in excavation,position cement concrete,random rubble stone masonry,pointing on stone mas
Read more
Cement,sand,stone aggregate,random rubble,stone aggregate,stone aggregate,wooden scantling four inc
Read more