Tender Details

Particulars Details
Title
Removal Of Old Pvc Fills Along With Associated Components And Providing, Fixing, And Erecting Of New Pvc Fills Along With Associated Components At Location In Ndct 6 During Biennial Shutdown Of Unit 6, Rrs 5and6, Plant Site.
Description
Removal Of Old Pvc Fills Along With Associated&#X0d Components And Providing, Fixing, And Erecting Of New&#X0d Pvc Fills Along With Associated Components At Location&#X0d In Ndct 6 During Biennial Shutdown Of Unit 6, Rrs &#X0d 5and6, Plant Site.
Organisation Nuclear Power Corporation Of India Limited | Public Sector Undertakings
Tender Id 2025_NPCIL_243910_1
Reference
Number
NPC/RRS/56/2025/CPT-A2865
Tender Fee 0
EMD 9.22 Lakh
Tender Value -
Place RAPS-5 and 6, RR Site
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=278590

Start Date August 19, 2025 16:30
End Date
Expired 26/08/2025

Expired 414 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Removal of old fills distribution headers and providing fixing and erecting of new pvc fills and pvc distribution headers at location in ndct 4

Removal of old fills, distribution headers and providing, fixing and erecting of new pvc fills and pvc distribution headers at location in ndct-4 during biennial shutdown bsd of unit-4 rrs- 3 and 4 plant site

Read more
Mtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i

Mtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i

Read more
Mtps i ca cws i cooling tower i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2024 2025 of unit i

Mtps i ca cws i cooling tower i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2024 2025 of unit i

Read more
Design, engineering, manufacturing / fabrication, supply, supervision of erection and commissioning, shop painting, shop testing, packing, transportation of all associated electro-mechanical equipment including pvc grids, pvc fills, drift eliminator

Design, engineering, manufacturing / fabrication, supply, supervision of erection and commissioning, shop painting, shop testing, packing, transportation of all associated electro-mechanical equipment including pvc grids, pvc fills, drift eliminator

Read more
Providing, erecting, testing commissioning of 630 kva level-ii distribution transformer along with allied components at karua.

Providing, erecting, testing commissioning of 630 kva level-ii distribution transformer along with allied components at karua.

Read more
Assistance in routine prive breakdown and shutdown maintenance work of motorized and pneumatic operated valves and gear box along with associated electrical/pneumatic actuators of 4x210 mw ggsstp units, rupnagar

Assistance in routine prive breakdown and shutdown maintenance work of motorized and pneumatic operated valves and gear box along with associated electrical/pneumatic actuators of 4x210 mw ggsstp units, rupnagar

Read more
Assistance in routine, prive breakdown and shutdown maintenance work of motorized and pneumatic operated valves and gear box along with associated electrical pneumatic actuators of 4x210 mw ggsstp units rupnagar

Assistance in routine, prive breakdown and shutdown maintenance work of motorized and pneumatic operated valves and gear box along with associated electrical pneumatic actuators of 4x210 mw ggsstp units rupnagar

Read more
Routine, prive, breakdown and shutdown maintenance work of motorized and pneumatically operated valves and gear boxes along with associated electrical and pneumatic actuators and manually operated instrument root valves situated in

Tg area, boiler area, ldo and hfo and cw pump house, dm plant and ash water recovery system etc. at ghtp, lehra mohabbat stage 1 (2x210 mw) and stage 2 (2x250 mw), district bathinda (punjab)

Read more
Annual maintenance contract for operations and maintenance of 2000 tr district cooling hvac chiller system along with associated components and 150 hp vrv system connected facilities including complaint management of all facilities

Annual maintenance contract for operations and maintenance of 2000 tr district cooling hvac chiller system along with associated components and 150 hp vrv system connected facilities including complaint management of all facilities

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise