Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Removal Of Old Pvc Fills Along With Associated Components And Providing, Fixing, And Erecting Of New Pvc Fills Along With Associated Components At Location In Ndct 6 During Biennial Shutdown Of Unit 6, Rrs 5and6, Plant Site.
|
| Description |
Removal Of Old Pvc Fills Along With Associated
Components And Providing, Fixing, And Erecting Of New
Pvc Fills Along With Associated Components At Location
In Ndct 6 During Biennial Shutdown Of Unit 6, Rrs 
5and6, Plant Site.
|
| Organisation | Nuclear Power Corporation Of India Limited | Public Sector Undertakings |
| Tender Id | 2025_NPCIL_243910_1 |
|
Reference Number |
NPC/RRS/56/2025/CPT-A2865 |
| Tender Fee | 0 |
| EMD | 9.22 Lakh |
| Tender Value | - |
| Place | RAPS-5 and 6, RR Site |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=278590 |
| Start Date | August 19, 2025 16:30 |
| End Date |
Expired
26/08/2025
Expired 414 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Removal of old fills distribution headers and providing fixing and erecting of new pvc fills and pvc distribution headers at location in ndct 4
Removal of old fills, distribution headers and providing, fixing and erecting of new pvc fills and pvc distribution headers at location in ndct-4 during biennial shutdown bsd of unit-4 rrs- 3 and 4 plant site
Read moreMtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i
Mtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i
Read moreMtps i ca cws i cooling tower i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2024 2025 of unit i
Mtps i ca cws i cooling tower i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2024 2025 of unit i
Read moreDesign, engineering, manufacturing / fabrication, supply, supervision of erection and commissioning, shop painting, shop testing, packing, transportation of all associated electro-mechanical equipment including pvc grids, pvc fills, drift eliminator
Design, engineering, manufacturing / fabrication, supply, supervision of erection and commissioning, shop painting, shop testing, packing, transportation of all associated electro-mechanical equipment including pvc grids, pvc fills, drift eliminator
Read moreProviding, erecting, testing commissioning of 630 kva level-ii distribution transformer along with allied components at karua.
Providing, erecting, testing commissioning of 630 kva level-ii distribution transformer along with allied components at karua.
Read moreRoutine, preventive, breakdown and shutdown maintenance work of motorized, pneumatically operated valves and gear boxes along with associated electrical/pneumatic actuators situated in
Tg area, boiler area, ldo/hfoand cw pump house, dm plant and ash water recovery system etc. at ghtp, lehra mohabbat
Read moreAssistance in routine prive breakdown and shutdown maintenance work of motorized and pneumatic operated valves and gear box along with associated electrical/pneumatic actuators of 4x210 mw ggsstp units, rupnagar
Assistance in routine prive breakdown and shutdown maintenance work of motorized and pneumatic operated valves and gear box along with associated electrical/pneumatic actuators of 4x210 mw ggsstp units, rupnagar
Read moreAssistance in routine, prive breakdown and shutdown maintenance work of motorized and pneumatic operated valves and gear box along with associated electrical pneumatic actuators of 4x210 mw ggsstp units rupnagar
Assistance in routine, prive breakdown and shutdown maintenance work of motorized and pneumatic operated valves and gear box along with associated electrical pneumatic actuators of 4x210 mw ggsstp units rupnagar
Read moreRoutine, prive, breakdown and shutdown maintenance work of motorized and pneumatically operated valves and gear boxes along with associated electrical and pneumatic actuators and manually operated instrument root valves situated in
Tg area, boiler area, ldo and hfo and cw pump house, dm plant and ash water recovery system etc. at ghtp, lehra mohabbat stage 1 (2x210 mw) and stage 2 (2x250 mw), district bathinda (punjab)
Read moreAnnual maintenance contract for operations and maintenance of 2000 tr district cooling hvac chiller system along with associated components and 150 hp vrv system connected facilities including complaint management of all facilities
Annual maintenance contract for operations and maintenance of 2000 tr district cooling hvac chiller system along with associated components and 150 hp vrv system connected facilities including complaint management of all facilities
Read moreof your Industry type