Tender Details

Particulars Details
Title
Sopd G 23 24 08 Re Construction And Improvement Of Damaged Cross Drainage Structures And Bridge Approaches Including Dilapidated Road Stretches Along The Route Connecting From Nh 15 At Solengi To Rajgarh Road And Ghagrabasti Via Sonapur Under Sopd G
Description
Sopd G 23 24 08 Re Construction And Improvement Of Damaged Cross Drainage Structures And Bridge Approaches Including Dilapidated Road Stretches Along The Route Connecting From Nh 15 At Solengi To Rajgarh Road And Ghagrabasti Via Sonapur Under Sopd G
Organisation Government of Assam
Tender Id 2023_PWD_31941_1
Reference
Number
CE/DEV/TB/75/2023-24/03
Tender Fee 7080
EMD 7.08 Lakh
Tender Value
Place O/o the Chief Engineer Roads, PWRD, Assam,
Link https://assamtenders.gov.in
Start Date August 17, 2023 19:30
End Date

24/08/2023 ( Expired 606 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Filling of potholes, ditches of roads with stone dust and metal from police picket to weigh bridge no.15 under ashok ocp, piparwar and providing and fixing rcc hume pipes across haul road at locations where cross drainage is required and garland drai

Filling of potholes, ditches of roads with stone dust and metal from police picket to weigh bridge no.15 under ashok ocp, piparwar and providing and fixing rcc hume pipes across haul road at locations where cross drainage is required and garland drai

Read more
Filling of potholes, ditches of roads with stone dust and metal from police picket to weigh bridge no.15 under ashok ocp, piparwar and providing and fixing rcc hume pipes across haul road at locations where cross drainage is required and garland drai

Filling of potholes, ditches of roads with stone dust and metal from police picket to weigh bridge no.15 under ashok ocp, piparwar and providing and fixing rcc hume pipes across haul road at locations where cross drainage is required and garland drai

Read more
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.

Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.

Read more
Sopd_g_24_25_42 construction of road cum embankment on left bank of dikrong river (nh-15 at bahanibari to sissapathar bridge approach) (part -3. from ch. 15140.00 to 18400.00m) including approach roads under sopd-g for the year 2024-25

Sopd_g_24_25_42 construction of road cum embankment on left bank of dikrong river (nh-15 at bahanibari to sissapathar bridge approach) (part -3. from ch. 15140.00 to 18400.00m) including approach roads under sopd-g for the year 2024-25

Read more
Re-construction of drain cum footh path, cross culvert etc on hatigaon main road from basisthapur byelane 1 via lnb,bishnujyoti path,sijubari chariali towards basistha river under sopd-g for flood mitigation of hatigaon area for the year 2024-25

Re-construction of drain cum footh path, cross culvert etc on hatigaon main road from basisthapur byelane 1 via lnb,bishnujyoti path,sijubari chariali towards basistha river under sopd-g for flood mitigation of hatigaon area for the year 2024-25

Read more
Road from nh-27 byepass connecting lakshmibai national institute of physical education at tepesia and mayfair spring valley resort

Proposed construction of road from nh-27 byepass connecting lakshmibai national institute of physical education at tepesia and mayfair spring valley resort, sonapur under sopd(g) for the year 2024-25

Read more
Sopd_g_24_25_40 improvement of road from 8th km of dejoo kiroad to harmutty at nh-15 via phulbari, dhekiajuli and santipur (ch.5350.00m to 9196.00m, ch.9950.00m to ch.11800.00, ch.11800.00m to ch.12900.00m, ch.12900.00m to ch.14110.00m, ch.16815.

Sopd_g_24_25_40 improvement of road from 8th km of dejoo kiroad to harmutty at nh-15 via phulbari, dhekiajuli and santipur (ch.5350.00m to 9196.00m, ch.9950.00m to ch.11800.00, ch.11800.00m to ch.12900.00m, ch.12900.00m to ch.14110.00m, ch.16815.

Read more
Sopd_g_24_25_20 construction of moinapara athaichuk to gumnadi pratapgarh via kolarichuk rongpuria including nh 15 boginadi to no2 tariyani jengrai garam bazar road (part1- moinapara athaichuk to pratapgarh from ch-0.00 m to 6900.00 m) under sopd-g f

Sopd_g_24_25_20 construction of moinapara athaichuk to gumnadi pratapgarh via kolarichuk rongpuria including nh 15 boginadi to no2 tariyani jengrai garam bazar road (part1- moinapara athaichuk to pratapgarh from ch-0.00 m to 6900.00 m) under sopd-g f

Read more
Sopd_g_24_25_35 improvement and strengthening of road from amoni (nh-127) to salana via amlakhi te (ch.0.00m to ch.6000.00m) under sopd-g for the year 2024-25 under kaliabor and samaguri territorial road division , kaliabor lac.

Sopd_g_24_25_35 improvement and strengthening of road from amoni (nh-127) to salana via amlakhi te (ch.0.00m to ch.6000.00m) under sopd-g for the year 2024-25 under kaliabor and samaguri territorial road division , kaliabor lac.

Read more
Pwd-nh(br)/ran/sopd/2024-25/01 construction of new bridge over river mangoldoi (br.no 35/1) including approaches, service road and drain in place of the abandoned bailey bridge on nh-15 under sopd for the year 2024-25 under pwd rangia nh division in

Pwd-nh(br)/ran/sopd/2024-25/01 construction of new bridge over river mangoldoi (br.no 35/1) including approaches, service road and drain in place of the abandoned bailey bridge on nh-15 under sopd for the year 2024-25 under pwd rangia nh division in

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise