Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Miscellaneous Civil Works From Deepali Chowk Station To Derawal Nagar Of Line 8 Extension Of Delhi Mrts Phase Iv Project.
|
| Description |
Miscellaneous Civil Works From Deepali Chowk Station To Derawal Nagar Of Line 8 Extension Of Delhi Mrts Phase Iv Project.
|
| Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_DMRC_851996_1 |
|
Reference Number |
CPM-2/2024-25/D-5 |
| Tender Fee | 5900 |
| EMD | 1.95 Lakh |
| Tender Value | - |
| Place | Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=895620 |
| Start Date | March 15, 2025 14:30 |
| End Date |
Expired
22/03/2025
Expired 571 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of jcb and tractor with trolley for miscellaneous works in phase-iv.
Hiring of jcb and tractor with trolley for miscellaneous works in phase-iv.
Read moreLkgc (02)-01 general consultancy services for lucknow mrts project phase 1b
Lkgc 02 01 general consultancy services for lucknow mrts project phase 1b
Read moreDesign, supply, installation, testing and commissioning of interoperable signalling system for lajpat nagar - saket g-block corridor (line-11) of delhi metro phase-iv mrts.
Design, supply, installation, testing and commissioning of interoperable signalling system for lajpat nagar - saket g-block corridor (line-11) of delhi metro phase-iv mrts.
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreEngagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.
Engagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.
Read morePart design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Read moreHiring of jcb machine and tractor with trolley for miscellaneous works in phase-iii at imt bawal.
Hiring of jcb machine and tractor with trolley for miscellaneous works in phase-iii at imt bawal.
Read moreShifting of transformer and dg set at state cyber crime bldg phase-iv, sas nagar
Shifting of transformer and dg sets at state cyber crime building at phase-iv s.a.s. nagar
Read moreConstruction of main drainage line at kursoo rajbagh from dws to raj bagh, extension, srinagar ( phase ist )
Construction of main drainage line at kursoo rajbagh from dws to raj bagh, extension, srinagar ( phase ist )
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system including central computer and back-office for 24 stations of corridor-1 and 2 of phase-1 of patna mrts with fi/acquirer bank.
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system including central computer and back-office for 24 stations of corridor-1 and 2 of phase-1 of patna mrts with fi/acquirer bank.
Read moreof your Industry type