Tender Details
Particulars | Details |
---|---|
Title |
Consultancy Work For Preparation Of Detailed Project Report (Dpr) Including Detail Design And Drawing For Bypass On Nagar To Kumher Road In Village Sundrawali And Janoothar (Nagar) (7.50 Km) Under Budget 2025 26
|
Description |
Consultancy Work For Preparation Of Detailed Project Report (Dpr) Including Detail Design And Drawing For Bypass On Nagar To Kumher Road In Village Sundrawali And Janoothar (Nagar) (7.50 Km) Under Budget 2025 26
|
Organisation | PWD - CE AND AS | State Govt. and UT |
Tender Id | 2025_CEPWD_465509_1 |
Reference Number |
NIT No. 01/2025-26 PWD Dn. Nagar |
Tender Fee | 1000 |
EMD | 20000 |
Tender Value | |
Place | Nagar |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=834365 |
Start Date | May 05, 2025 14:30 |
End Date |
15/05/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreConsultancy services for preparation of dpr and land acquisition of tamsa city bypass road on nh 752i km 0.00 to km 3.00 in taluka hadgaon district nanded in the state of maharashtra on epc mode length 3.00 km
Consultancy services for preparation of dpr and land acquisition of tamsa city bypass road on nh 752i km 0.00 to km 3.00 in taluka hadgaon district nanded in the state of maharashtra on epc mode length 3.00 km
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreAnnual maintenance plan-i for the year 2025-26 on thatharna to thanga i.e link road to village devna km. 0/0 to 3/130 vr (non pmgsy)(sh repair of pot holes and bitumenous concrete 25 mm thick using plastic based from km. 2/00 to 3/130 ) 1.13
Annual maintenance plan-i for the year 2025-26 on thatharna to thanga i.e link road to village devna km. 0/0 to 3/130 vr (non pmgsy)(sh repair of pot holes and bitumenous concrete 25 mm thick using plastic based from km. 2/00 to 3/130 ) 1.13
Read moreConsultancy work of preparation of detailed project report for the balance work of the scheme approved under provision 4a(i) of cmjay on uda land located at aaraji no. 7593, 7594, 7595, 7623, 7624, 7676, 7588 to 7592 in revenue village umarda, udaipu
Consultancy work of preparation of detailed project report for the balance work of the scheme approved under provision 4a(i) of cmjay on uda land located at aaraji no. 7593, 7594, 7595, 7623, 7624, 7676, 7588 to 7592 in revenue village umarda, udaipu
Read moreWork construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district t.g. under state sector (first phase work design drawing vetting dpr preparation etc.
Work construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district t.g. under state sector (first phase work design drawing vetting dpr preparation etc.
Read moreConsultancy services for preparation of detailed project report to widening from 2lane to 4lane of reach from km 1/5 to 3/7 under long term rectification of black spots (id tg-02-205 and tg-05-181) on khammam -aswaraopeta section of nh365bb
Consultancy services for preparation of detailed project report to widening from 2lane to 4lane of reach from km 1/5 to 3/7 under long term rectification of black spots (id tg-02-205 and tg-05-181) on khammam -aswaraopeta section of nh365bb
Read moreSelection of design consultancy for formation of 18 km of new footpath including site documentation and conceptual design drawing development, site implementation support, with standard design considerations, and preparation and submission of boq in
Selectionof design consultancy for formationof 18km of newfootpath including site documentation and conceptual design drawing development, site implementation support with standard designconsiderations, and preparation and submissionof boq in z 8to15
Read moreConsultancy services for preparation of dpr including land acquisition and detailed design and drawing of road and rob (1 nos) for construction of bye-pass road from nh-458 to nh-58 bypass road with rob dpr (15 km)
Consultancy services for preparation of dpr including land acquisition and detailed design and drawing of road and rob (1 nos) for construction of bye-pass road from nh-458 to nh-58 bypass road with rob dpr (15 km)
Read moreConsultancy services for preparation of detailed project report dpr for upgradation of existing 2 lane road to 4 lane road connecting sector 23-25 diving road and leading towards nh-07 approx. length 870 meters including design of major bridge on na
Consultancy services for preparation of detailed project report dpr for upgradation of existing 2 lane road to 4 lane road connecting sector 23-25 diving road and leading towards nh-07 approx. length 870 meters including design of major bridge
Read moreof your Industry type