Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Preparation Of Detailed Project Report (Dpr) And Pre Construction Activities For Construction Of 2 Lane Joshimath Bypass By Exploring Utilisation Of The Alignment Of The Foreclosed Joshimath Bypass Project Along With Alternat
|
| Description |
Construction Of 2 Lane Joshimath Bypass By Exploring Utilisation Of The Alignment Of The Foreclosed Joshimath Bypass Project Along With Alternate Alignment Options From Km 465.000 To Km 472.000 Of Nh 07 In The State Of Uttarakhand.(Length 7 Km).
|
| Organisation | Ministry of Road Transport and Highways | P1 Delhi - MoRTH | RO Dehradun - MoRTH | NH Uttarakhand PWD-NH-Section-Dehradun - MoRTH |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 5000 |
| EMD | 1.24 Lakh |
| Tender Value | 61.79 Lakh |
| Place | |
| Link | Login to view |
| Start Date | October 08, 2026 00:25 |
| End Date |
Open
23/11/2026
42 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preparation of detailed feasibility report (dfr) cum detailed project report (dpr) for rejuvenation and exploring the mode of water metro transport along the buckingham canal from ennore to mahabalipuram
Preparation of detailed feasibility report (dfr) cum detailed project report (dpr) for rejuvenation and exploring the mode of water metro transport along the buckingham canal from ennore to mahabalipuram
Read moreConsultancy services for preparation of dpr / feasibility report for jaigad port chiplun satara (junction with nh-48) greenfield alignment in the state of maharashtra (98 km)
Consultancy services for preparation of dpr / feasibility report for jaigad port chiplun satara (junction with nh-48) greenfield alignment in the state of maharashtra (98 km)
Read moreConsultancy services for preparation of dpr-feasibility report development of port connectivity from dighi port-poladpur-surur (junction with nh-48) greenfield alignment (approx. length-140 km.)
Consultancy services for preparation of dpr-feasibility report development of port connectivity from dighi port-poladpur-surur (junction with nh-48) greenfield alignment (approx. length-140 km.)
Read moreConsultancy services for preparation of detailed project report dpr for construction of a new 4lane greenfield eastern bypass of shivpuri approx. 13km and a new 4lane greenfield eastern bypass of guna approx. 21km in the state of mp.
Consultancy services for preparation of detailed project report dpr for construction of a new 4lane greenfield eastern bypass of shivpuri approx. 13km and a new 4lane greenfield eastern bypass of guna approx. 21km in the state of mp.
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a.
Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a in the state of uttarakhand. (length 136 km).
Read moreConsultancy services for feasibility study and preparation of detailed project report (dpr) of widening to 4l road of barpalli- balangir -kesinga bhawanipatna -junagarh on nh 26 from 21/000 to 202/000 km excluding bhawanipatna bypass for odisha
Consultancy services for feasibility study and preparation of detailed project report (dpr) of widening to 4l road of barpalli- balangir -kesinga bhawanipatna -junagarh on nh 26 from 21/000 to 202/000 km excluding bhawanipatna bypass for odisha
Read moreCs for survey investigation prep of dpr and providing preconstruction activities for constr of rd bishing to ssp greenfield alignment bet km 0.00 to km 17.50 indicative length 17.50 km to nhsl specification under 1448 bcc 761 tf project bmk
Cs for survey investigation prep of dpr and providing preconstruction activities for constr of rd bishing to ssp greenfield alignment bet km 0.00 to km 17.50 indicative length 17.50 km to nhsl specification under 1448 bcc 761 tf project bmk
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707a.
Widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707ain the state of uttarakhand. (length-175 km).
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a in the state of uttarakhand. (length 80 km).
Read moreConsultancy services for preparation of detailed project report dpr and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109 (old nh 87ext) in the state of uttarakhand.(length- 235 km).
Read moreof your Industry type