Tender Details

Particulars Details
Title
Echpii Upkeepment And Clearing Of Coal On Walkways, Belt Side To The Entire Length Of Conveyor, Deck Sheets From Head End To Tail End Of Conveyor 48 A1 48 B1 At Sch Ii
Description
Echpii Upkeepment And Clearing Of Coal On Walkways, Belt Side To The Entire Length Of Conveyor, Deck Sheets From Head End To Tail End Of Conveyor 48 A1 48 B1 At Sch Ii
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_527689_1
Reference
Number
CE/SE/MI/TTPS/54/2025-2026
Tender Fee 0
EMD 8200
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628365
Start Date February 25, 2025 14:30
End Date

11/03/2025 ( Expired 110 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Read more
Work of providing consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal mines of wcl withing 40 km to stps, mppgcl, sarni at stps

Work of providing consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal mines of wcl withing 40 km to stps, mppgcl, sarni at stps

Read more
Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)

Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)

Read more
Replacement of damaged 15nos 42rsj pole at 33kv wind form sriram i ii feeder fed from 110 33-11kv keelpavoor ss due to heavy rain on 13.12.2024 from sp puram goverment school back side river kalvai crossing at sundarapandyapuram section,suranda

Replacement of damaged 15nos 42rsj pole at 33kv wind form sriram i ii feeder fed from 110 33-11kv keelpavoor ss due to heavy rain on 13.12.2024 from sp puram goverment school back side river kalvai crossing at sundarapandyapuram section,suranda

Read more
Supply and erection of seal plates ss 304 gr 3 mm thick for conveyor 48 a1 belt side at sch ii

Supply and erection of seal plates ss 304 gr 3 mm thick for conveyor 48 a1 belt side at sch ii

Read more
Echp-ii- replacement of worn out/ damaged conveyor belt to a length of 22 mtrs. each of 1800mm bw in belt feeder rbfd-1a 1b at jt-20.

Echp-ii- replacement of worn out/ damaged conveyor belt to a length of 22 mtrs. each of 1800mm bw in belt feeder rbfd-1a 1b at jt-20.

Read more
Cleaning and removing of coal dust muck accumulating on regular basis near till end of different conveyor belt at rchp under rajmahal area. (for 12 months)

Cleaning and removing of coal dust muck accumulating on regular basis near till end of different conveyor belt at rchp under rajmahal area. (for 12 months)

Read more
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m

Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m

Read more
Ttps operation circle mpm i units i and ii emptying of coal from rc bunkers 1a to 1f and 2a to 2f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps

Ttps operation circle mpm i units i and ii emptying of coal from rc bunkers 1a to 1f and 2a to 2f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps

Read more
Construction of 65 m mtr. wharf from chainage 244 m to 309m on the lee side of break water at androth for coast guard vessels- providing external service power/ water supply and firefighting equipment- phase-ii

Construction of 65 m mtr. wharf from chainage 244 m to 309m on the lee side of break water at androth for coast guard vessels- providing external service power/ water supply and firefighting equipment- phase-ii

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise