Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Echpii Upkeepment And Clearing Of Coal On Walkways, Belt Side To The Entire Length Of Conveyor, Deck Sheets From Head End To Tail End Of Conveyor 48 A1 48 B1 At Sch Ii
|
Description |
Echpii Upkeepment And Clearing Of Coal On Walkways, Belt Side To The Entire Length Of Conveyor, Deck Sheets From Head End To Tail End Of Conveyor 48 A1 48 B1 At Sch Ii
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527689_1 |
Reference Number |
CE/SE/MI/TTPS/54/2025-2026 |
Tender Fee | 0 |
EMD | 8200 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628365 |
Start Date | February 25, 2025 14:30 |
End Date |
11/03/2025 ( Expired 110 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreWork of providing consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal mines of wcl withing 40 km to stps, mppgcl, sarni at stps
Work of providing consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal mines of wcl withing 40 km to stps, mppgcl, sarni at stps
Read moreIndependent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Read moreReplacement of damaged 15nos 42rsj pole at 33kv wind form sriram i ii feeder fed from 110 33-11kv keelpavoor ss due to heavy rain on 13.12.2024 from sp puram goverment school back side river kalvai crossing at sundarapandyapuram section,suranda
Replacement of damaged 15nos 42rsj pole at 33kv wind form sriram i ii feeder fed from 110 33-11kv keelpavoor ss due to heavy rain on 13.12.2024 from sp puram goverment school back side river kalvai crossing at sundarapandyapuram section,suranda
Read moreSupply and erection of seal plates ss 304 gr 3 mm thick for conveyor 48 a1 belt side at sch ii
Supply and erection of seal plates ss 304 gr 3 mm thick for conveyor 48 a1 belt side at sch ii
Read moreEchp-ii- replacement of worn out/ damaged conveyor belt to a length of 22 mtrs. each of 1800mm bw in belt feeder rbfd-1a 1b at jt-20.
Echp-ii- replacement of worn out/ damaged conveyor belt to a length of 22 mtrs. each of 1800mm bw in belt feeder rbfd-1a 1b at jt-20.
Read moreCleaning and removing of coal dust muck accumulating on regular basis near till end of different conveyor belt at rchp under rajmahal area. (for 12 months)
Cleaning and removing of coal dust muck accumulating on regular basis near till end of different conveyor belt at rchp under rajmahal area. (for 12 months)
Read moreNctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Read moreTtps operation circle mpm i units i and ii emptying of coal from rc bunkers 1a to 1f and 2a to 2f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps
Ttps operation circle mpm i units i and ii emptying of coal from rc bunkers 1a to 1f and 2a to 2f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps
Read moreConstruction of 65 m mtr. wharf from chainage 244 m to 309m on the lee side of break water at androth for coast guard vessels- providing external service power/ water supply and firefighting equipment- phase-ii
Construction of 65 m mtr. wharf from chainage 244 m to 309m on the lee side of break water at androth for coast guard vessels- providing external service power/ water supply and firefighting equipment- phase-ii
Read moreof your Industry type