Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Echp Ii Upkeepment And Clearing Of Coal On Walkways, Belt Side To The Entire Length Of Conveyor, Deck Sheets From Head End To Tail End Of Conveyor 48 A148 B1 At Sch Ii
|
| Description |
Echp Ii Upkeepment And Clearing Of Coal On Walkways, Belt Side To The Entire Length Of Conveyor, Deck Sheets From Head End To Tail End Of Conveyor 48 A148 B1 At Sch Ii
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_409427_1 |
|
Reference Number |
CE/SE/MI/TTPS/54/2024-2025 |
| Tender Fee | 0 |
| EMD | 7500 |
| Tender Value | |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=487165 |
| Start Date | January 12, 2024 23:30 |
| End Date |
Expired
29/01/2024
Expired 877 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreEchpii upkeepment and clearing of coal on walkways, belt side to the entire length of conveyor, deck sheets from head end to tail end of conveyor 48a1 48b1 at sch ii
Echpii upkeepment and clearing of coal on walkways, belt side to the entire length of conveyor, deck sheets from head end to tail end of conveyor 48a1 48b1 at sch ii
Read moreEchp-ii clearing the coal coal dust and foreign materials daily on walkways, deck sheet monitoring cleaning and checking the mechanical equipments of conveyor 72 73 .
Echp-ii clearing the coal coal dust and foreign materials daily on walkways, deck sheet monitoring cleaning and checking the mechanical equipments of conveyor 72 73 .
Read moreEchp-ii- upkeepment and cleaning of coal in belt feeder-4a4b, sc-1a1b, 2a2b, eds-1a1b, 2a2b, shuttle feeder-2a 2b, deck sheet and walkways etc., at sch-ii
Echp-ii- upkeepment and cleaning of coal in belt feeder-4a4b, sc-1a1b, 2a2b, eds-1a1b, 2a2b, shuttle feeder-2a 2b, deck sheet and walkways etc., at sch-ii
Read moreEchpii clearing the coal coal dust and foreign materials daily on walkways of both side side under belt throughout conveyors deck sheet and tail end areas monitoring cleaning and checking the mechanical equipments of conveyor 72 73 .
Echpii clearing the coal coal dust and foreign materials daily on walkways of both side side under belt throughout conveyors deck sheet and tail end areas monitoring cleaning and checking the mechanical equipments of conveyor 72 73 .
Read moreChp-ii- upkeepment of conveyors by cleaning the coal, coal powder and foreign materials etc., on walk ways, belt, deck sheets, head end floor and tail end areas of conveyor-68 and cleaning, checking and round the clock monitoring.
Chp-ii- upkeepment of conveyors by cleaning the coal, coal powder and foreign materials etc., on walk ways, belt, deck sheets, head end floor and tail end areas of conveyor-68 and cleaning, checking and round the clock monitoring.
Read moreEchp-ii- upkeepment and cleaning of coal in belt feeder-4a4b, sc-1a 1b, 2a2b, eds-1a 1b, 2a 2b, shuttle feeder-2a/2b, deck sheet and walkways etc., at sch-ii
Echp-ii- upkeepment and cleaning of coal in belt feeder-4a4b, sc-1a 1b, 2a2b, eds-1a 1b, 2a 2b, shuttle feeder-2a/2b, deck sheet and walkways etc., at sch-ii
Read moreUpkeepment of spilled materials from tail end side of unit no. 301 belt conveyor, deck plates, gallery, rollers etc. at madhuban coal washery under block-ii area, bccl
Upkeepment of spilled materials from tail end side of unit no. 301 belt conveyor, deck plates, gallery, rollers etc. at madhuban coal washery under block-ii area, bccl
Read moreEchpii upkeepment of conveyors by cleaning the coal, coal powder and foreign materials etc., on walk ways, belt, deck sheets, head end floor and tail end areas of conveyor68 and cleaning, checking and round the clock
Echpii upkeepment of conveyors by cleaning the coal, coal powder and foreign materials etc., on walk ways, belt, deck sheets, head end floor and tail end areas of conveyor68 and cleaning, checking and round the clock
Read moreUpkeepment of spilled materials from tail end side of unit no. 301 belt conveyor, deck plates, gallery and return rollers etc at madhuban coal washery under block-ii area, bccl.
Upkeepment of spilled materials from tail end side of unit no. 301 belt conveyor, deck plates, gallery and return rollers etc at madhuban coal washery under block-ii area, bccl.
Read moreof your Industry type