Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
R.D.C.S.M.E.D.C.No S1/181/2025
|
Description |
Hiring 02 Nos. Of Hmv Tipper Vehicles And One Front End Loader Equipment With Back Hoe Attachment To Carry Out Conservancy Works In Perumbakkam Zone Xv For 03 Months On Contract Basis.
|
Organisation | Corporation of Chennai | State Govt. and UT |
Tender Id | 2025_CoC_576303_1 |
Reference Number |
R.D.C.S.M.E.D.C.No S1/181/2025 |
Tender Fee | 0 |
EMD | 18000 |
Tender Value | |
Place | South Region |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=688637 |
Start Date | July 01, 2025 18:40 |
End Date |
10/07/2025 ( Expired 6 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewNotice inviting expression of interest eoi for registration of radiologist and firms for empanelment in tele radiology reporting panel
Read moreWidening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26
Read moreRequest for pre-qualification (rfq) - 2025 for the maintenance works to be taken up on risk and cost of the concessionaire/contractor-2nd list.
Request for pre-qualification (rfq) - 2025 for the maintenance works to be taken up on risk and cost of the concessionaire/contractor-2nd list.
Read moreAAAAAAAAAA
Login to viewConstruction to 2-lane with paved shoulder of tura bypass ing from existing km
 57.500 of nh-127b and ending at existing km 108.750 of nh- 217 (length-29.030 km) on hybrid annuity mode in the state of meghalaya.
Read moreAAAAAAAAAA
Login to viewProcurement of 1000 mw energy&#x0d storage capacity (for 9 hours discharge with&#x0d maximum 6 hours continuous discharge) for 40&#x0d years from grid connected pumped hydro&#x0d storage plant/s through competitive bidding
Read moreAAAAAAAAAA
Login to viewWidening of valley side at km 20.900, km 35.500 and km 36.700 and culvert at 13 locations viz. km 17.600, km 17.800, km 18.300, km 20.200, km 21.500, km 21.650, km 21.850, km 32.800, km 33.100, km 38.300, km 40.300, km 43.700, km 47.300 on nh-10epc
Read moreReplacement of goose neck panel and bends (under capex 2025-26), rear water wall panel and overhauling of boiler pr. parts at unit #3, ktps.
Replacement of goose neck panel and bends (under capex 2025-26), rear water wall panel and overhauling of boiler pr. parts at unit #3, ktps.
Read moreNhidcl/ar.pr./pango-jorging (pkg-ii)/nh-913/2025
Construction of intermediate lane of pango to jorging road from design km 40.000 to design km 82.060 section of frontier highway nh913 design length 42.06 km, pkg_ii, greenfield alignment
Read moreof your Industry type