Title |
Construction Of Two Lane To Four Lane Road With Paved Shoulder From Mangalwar Km. 0/00 To Km. 37/225 Nimbahera Junction Nh 56 (Total Length 37.225 Km.) Major District Road (Mdr 11 A) In District Chittorgarh, On Epc Mode
|
Description |
Construction Of Two Lane To Four Lane Road With Paved Shoulder From Mangalwar Km. 0/00 To Km. 37/225 Nimbahera Junction Nh 56 (Total Length 37.225 Km.) Major District Road (Mdr 11 A) In District Chittorgarh, On Epc Mode
|
Organisation | RSRDCC-GM | State Govt. and UT |
Tender Id | 2025_RSRDC_451948_1 |
Reference Number |
RSRDCC NIT 510/2024-25 DATED 05.03.2025 |
Tender Fee | 14300 |
EMD | 4.46 Crore |
Tender Value | |
Place | District Chittorgarh, on EPC Mode |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=811157 |
Start Date | March 13, 2025 16:30 |
End Date |
01/04/2025 ( Expired 20 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreConsultancy services for preparation of dpr and land acquisition of bhokar city bypass road on nh61 connecting to nh161a km 0.00 to km 5.00 in bhokar taluka district nanded in the state of maharashtra on epc mode length 5.00 km
Consultancy services for preparation of dpr and land acquisition of bhokar city bypass road on nh61 connecting to nh161a km 0.00 to km 5.00 in bhokar taluka district nanded in the state of maharashtra on epc mode length 5.00 km
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening to 4 lane of nh-20 (old nh-75e) from km 16.400 to km 47.700 (tupudana to kundibartoli) in the state of jharkhand (total length 31.300 km) on hybrid annuity mode.
Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 (design chainage) to km
 47.700 (design chainage(tupudana to
 kundibartoli) in the state of jharkhand
 (total length 31.300 km) on hybrid annuity
 mode.
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreof your Industry type