Tender Details
Particulars | Details |
---|---|
Title |
18/ae(e)-i/ded-203/2024-25(1st recall)
|
Description |
Operation and maintenance of electrical mechanical installation at ignca building new delhi during 2024-25(sh-comprehensive maintenance of pac units (blue box make))
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id | 91399 |
Reference Number |
18/AE(E)-I/DED-203/2024-25(1st Recall) |
Tender Fee | 0 |
EMD | 8603 |
Tender Value | |
Place | |
Link | https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642439313339392431382f41452845292d492f4445442d3230332f323032342d32352831737420526563616c6c29 |
End Date |
21/10/2024 ( Expired 24 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of electrical and mechanical system of fire fighting and water supply system at brit
Supply, installation, testing and commissioning of electrical and mechanical system of fire fighting and water supply system at brit,
 vashi, navi mumbai
Read moreOperation and maintenance of new bus terminal and workshop block of prtc at patiala
Operation and maintenance of new bus terminal and workshop block of prtc at patiala
Read moreConstruction of proposed new building (bg9) opposite to centenary building within the campus of nrs medical college hospital, kolkata.(electrical works) ..... supply installation testing and commissioning of ups system.
Construction of proposed new building (bg9) opposite to centenary building within the campus of nrs medical college hospital, kolkata.(electrical works) ..... supply installation testing and commissioning of ups system.
Read moreAdditional electrical work for installation of vrf air-conditioning unit and new 02 nos. exhibition lounge, 04 nos. toilet, new fire staircase, new terrace and entrance with fire protection system work at department of education and arp lab annex bui
Additional electrical work for installation of vrf air-conditioning unit and new 02 nos. exhibition lounge, 04 nos. toilet, new fire staircase, new terrace and entrance with fire protection system work at department of education and arp lab annex bui
Read moreImprovement of water supply facility at 5th bn tsr hq/ sh maintenance of iron removal plant in/c. mechanical and electrical accessories, placing of filter media and other allied works related irp,maintenance of ci/di/pvc pipeline including washing o
Improvement of water supply facility at 5th bn tsr hq/ sh maintenance of iron removal plant in/c. mechanical and electrical accessories, placing of filter media and other allied works related irp,maintenance of ci/di/pvc pipeline including washing o
Read moreWater supply scheme under jjm in amarpur rd block under gomati district during the year 2023-24/sh drilling and development of 5(five) nos small bore deep tube well (sbdtw) by manual means in/c installation of pump set, electrical panel board to be
Water supply scheme under jjm in amarpur rd block under gomati district during the year 2023-24/sh drilling and development of 5(five) nos small bore deep tube well (sbdtw) by manual means in/c installation of pump set, electrical panel board to be
Read moreWater supply scheme under jjm in amarpur rd block under gomati district during the year 2024-25/sh laying of delivery pipeline in 5(five) nos. existing small bore deep tube well(sbdtw) in/c installation of pump set, electrical panel board to be ins
Water supply scheme under jjm in amarpur rd block under gomati district during the year 2024-25/sh laying of delivery pipeline in 5(five) nos. existing small bore deep tube well(sbdtw) in/c installation of pump set, electrical panel board to be ins
Read moreConstruction of residential towers, community building, shopping complex including allied works at centurian park phase-iii on design, engineering, procurement and construction (epc) basis including comprehensive operation and maintenance for 02 year
Construction of residential towers, community building, shopping complex including allied works at centurian park phase-iii on design, engineering, procurement and construction (epc) basis including comprehensive operation and maintenance for 02 year
Read moreAnnual maintenance contract for operation and maintenance of central air conditioning plant capacity 5x80 56tr installed at shakti bhawan hq building lucknow
Annual maintenance contract for operation and maintenance of central air conditioning plant capacity 5x80 56tr installed at shakti bhawan hq building lucknow
Read moreInstallation of highmast light including operation and maintenance for three years at industrial area purena distt. panna (mp)
Installation of highmast light including operation and maintenance for three years at industrial area purena distt. panna (mp)
Read moreof your Industry type