Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction/Restoration Of Bearas Irrigation Canal Drass Including R/Wall, Breast Wall And Massonary Channel At Spots In Km 1st And 2nd
|
Description |
Construction/Restoration Of Bearas Irrigation Canal Drass Including R/Wall, Breast Wall And Massonary Channel At Spots In Km 1st And 2nd
|
Organisation | Union Territory of Ladakh |
Tender Id | 2023_PWD_11008_3 |
Reference Number |
E-tender 65 of 2023-24-I-FC Kargil |
Tender Fee | 230 |
EMD | 46500 |
Tender Value | |
Place | Executive Engineer I and FC Division kargil |
Link | https://tenders.ladakh.gov.in |
Start Date | September 12, 2023 18:30 |
End Date |
22/09/2023 ( Expired 653 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of boundary wall and shed in devsthan at ward no.31
Construction of boundary wall and shed in devsthan at ward no.31
Read moreConstruction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle.
Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle
Read moreConstruction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.
Construction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreIntegration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Integration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreProviding of solar/power caution blinkers and illumination by solar/conventional lighting at median opening locations of morth identified blackspots/accident spots of hyderabad-vijayawada section of nh-65 from km.40 to 221.500 in the state of tg, ap.
Providing of solar/power caution blinkers and illumination by solar/conventional lighting at median opening locations of morth identified blackspots/accident spots of hyderabad-vijayawada section of nh-65 from km.40 to 221.500 in the state of tg, ap.
Read moreof your Industry type