Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Of Already Laid 30 Lbs Rail Line, Sleepers From Incline No 1 Upto 9 L/1 Dw And Its Loading, Transporting And Stacking At Surface/ Idle Galleries In Underground Just 2 Days Before Marching Of Lhcm Package And Loading, Transporting, Unloading
|
| Description |
Dismantling Of Already Laid 30 Lbs Rail Line, Sleepers From Incline No 1 Upto 9 L/1 Dw And Its Loading, Transporting And Stacking At Surface/ Idle Galleries In Underground Just 2 Days Before Marching Of Lhcm Package And Loading, Transporting, Unloading
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2024_SECL_297630_1 |
|
Reference Number |
GM/BSPR/GMO/Srvy/e-tender/ 2023-24/17 dt.04.01.24 |
| Tender Fee | - |
| EMD | 9800 |
| Tender Value | - |
| Place | BISHRAMPUR AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | January 06, 2024 15:30 |
| End Date |
Expired
16/01/2024
Expired 964 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, marching,ing of 02 transwitch units with switchgears at ug, dismantling ,marching of 01 faulty transwitch unit with idle switches to surface for repair, dismantling,transporting, installing 02 no.of 500 gpm pumps at ug for wp-ve-2.
Dismantling, marching,ing of 02 transwitch units with switchgears at ug, dismantling ,marching of 01 faulty transwitch unit with idle switches to surface for repair, dismantling,transporting, installing 02 no.of 500 gpm pumps at ug for wp-ve-2.
Read moreMarching route for lhcm as per requirement malma cleaning of galleries, demolishing of ventilation stopping, air crossing and reconstruction of 4 nos ventilation stopping in masan combined seamat shiwani u. g. mine under bhatgaon area.
Marching route for lhcm as per requirement malma cleaning of galleries, demolishing of ventilation stopping, air crossing and reconstruction of 4 nos ventilation stopping in masan combined seamat shiwani u. g. mine under bhatgaon area.
Read moreHeightening and widening, dismantling, loading, unloading, laying of trackline, cleaning, filling, levelling, wet drilling arrangement for roof support for proposed route of marching the lhcm in mk (top) seam of bartarai colliery
Heightening and widening, dismantling, loading, unloading, laying of trackline, cleaning, filling, levelling, wet drilling arrangement for roof support for proposed route of marching the lhcm in mk (top) seam of bartarai colliery
Read moreof your Industry type