Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Urgent Repair Of Approach Road From Loading Point To Transporting Road Of 7,8 Incline Of Dhori Khas , Dhori Area.
|
| Description |
Urgent Repair Of Approach Road From Loading Point To Transporting Road Of 7,8 Incline Of Dhori Khas , Dhori Area.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_302087_1 |
|
Reference Number |
GM(D)/SO(C)/E-tender /2023-24/1886 DT 19.02.2024 |
| Tender Fee | 0 |
| EMD | 4800 |
| Tender Value | - |
| Place | Dhori Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=312932 |
| Start Date | February 21, 2024 15:30 |
| End Date |
Expired
02/03/2024
Expired 959 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Making of 03 (three) nos. of ventilation stopping in proposed panel-o in 7 and 8 incline of dhori (k) colliery ,dhori area.
Making of 03 (three) nos. of ventilation stopping in proposed panel-o in 7 and 8 incline of dhori (k) colliery ,dhori area.
Read moreFor dismantling and manual transporting and stocking of ms pipe 10 inch 800 mtrs. and old ms pontoon dismantling and transporting loading and unloading at basdeopur colliery under sijua area
For dismantling and manual transporting and stocking of ms pipe 10 inch 800 mtrs. and old ms pontoon dismantling and transporting loading and unloading at basdeopur colliery under sijua area
Read moreDismantling loading transporting and assembling of udm 611 259 from surface to working kalimati seam at kumardhubi colliery mugma area
Dismantling loading transporting and assembling of udm 611 259 from surface to working kalimati seam at kumardhubi colliery mugma area
Read morePermanent restoration/construction for approach road to medical sub centre seri chowana km 1st takeup point
Permanent restoration/construction for approach road to medical sub centre seri chowana km 1st takeup point
Read moreRepairing and maintenance of rls building at loading point at madhuban coal washary under block-ii area
Repairing and maintenance of rls building at loading point at madhuban coal washary under block-ii area
Read moreA 6 inch ms pipe range laying 200 mtr new supplied pipe 250 mtr old pipe from 5and6 incline mouth to 2and7 incline drainage point at shyampur b colliery mugma area b 6 inch ms pipe range laying for 150 hp pump shifting at shyampur b colliery mugma a
A 6 inch ms pipe range laying 200 mtr new supplied pipe 250 mtr old pipe from 5and6 incline mouth to 2and7 incline drainage point at shyampur b colliery mugma area b 6 inch ms pipe range laying for 150 hp pump shifting at shyampur b colliery mugma a
Read moreIchp-collection, clearing of trash screen rejects at jt-3 segregated of lump coal and stones from trash screen rejects loading, transporting ,weighing and unloading the segregated lump coal and stones at the respective yards
Ichp-collection, clearing of trash screen rejects at jt-3 segregated of lump coal and stones from trash screen rejects loading, transporting ,weighing and unloading the segregated lump coal and stones at the respective yards
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreMaintaining, cleaning and upkeep of beds and lawns, toilets and platinum jubilee tower of right flank and governer view point, pavilion, approach roads, toilets at left flank of mettur dam for the period october 2026 to january 2027
Maintaining, cleaning and upkeep of beds and lawns, toilets and platinum jubilee tower of right flank and governer view point, pavilion, approach roads, toilets at left flank of mettur dam for the period october 2026 to january 2027
Read moreStart point with name plate,triple loading zone with name plate,zig zag path with name plate,l bend with name plate,aerial tunnel with name plate,bunker with name plate,fig 8 with name plate,vertical climb with name plate
Start point with name plate,triple loading zone with name plate,zig zag path with name plate,l bend with name plate,aerial tunnel with name plate,bunker with name plate,fig 8 with name plate,vertical climb with name plate
Read moreof your Industry type