Tender Details

Particulars Details
Title
Repairing Jobs In Jhelum Shovel Sl No Hmb531
Description
Repairing Of Dc Panel, Resistance Panel And Miscellaneous Other Repairing Jobs In Jhelum Shovel, Sl No Hmb531
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_305431_1
Reference
Number
GM-PA/AE(Excv)/23-24/34/533 dated 16.03.2024
Tender Fee 0
EMD 3900
Tender Value -
Place KHOTTADIH OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=316477

Start Date March 18, 2024 15:30
End Date
Expired 27/03/2024

Expired 928 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of tarpalin for shovel section rg ocp-iii rg-ii area

Procurement of tarpalin for shovel section rg ocp-iii rg-ii area

Read more
Procurement of d shackles for use at shovel section, rgocp-iii, rg-ii area.

Procurement of d shackles for use at shovel section, rgocp-iii, rg-ii area.

Read more
Procurement of kirloskar make 12bhp ta2 engine spares for shovel selection ocp-iii rg-ii on open enquiry basis

Procurement of kirloskar make 12bhp ta2 engine spares for shovel selection ocp-iii rg-ii on open enquiry basis

Read more
Purchase of hydraulic shovel metal pipe clamps for ex1900 and be1800 hydraulic shovels working at rgocp-iii rg-ii area

Purchase of hydraulic shovel metal pipe clamps for ex1900 and be1800 hydraulic shovels working at rgocp-iii rg-ii area

Read more
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Read more
Procurement of ashok leyland make 1618 and 1920 model mobile service can spares for shovel section ocp-iii, rg-ii on open enquiry basis

Procurement of ashok leyland make 1618 and 1920 model mobile service can spares for shovel section ocp-iii, rg-ii on open enquiry basis

Read more
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.

Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise