Mechanised Excavation, Loading & Transportation Of Bhq/ Bhj/ Inter Burden/ Waste From F Area Bolani
Description
Mechanised Excavation, Loading & Transportation Of Bhq/ Bhj/ Inter Burden/ Waste From F Area Of Bolani Ores Mines
Organisation Steel Authority of India Ltd | Public Sector Undertakings
Tender Id 101517
Reference
Number
176/EE(E)/LKO/2024-25
Tender Fee 0
EMD 5 Lakh
Tender Value -
Place Rourkela Steel Plant
Link
View Original Tender Notice

https://sailtenders.co.in/Home/TendDetails?hTend=101517

Start Date April 19, 2025 17:30
End Date
Expired 05/05/2025

Expired 531 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Work contract for excavation, loading, transportation and unloading of the ash from ash dyke ii of sgtps, birsinghpur, distt. umaria m.p. to private land no. 1130 s owned by shri sanjeev khandelwal, ward no.11 birsinghpur pali for filling subsid

Work contract for excavation, loading, transportation and unloading of the ash from ash dyke ii of sgtps, birsinghpur, distt. umaria m.p. to private land no. 1130 s owned by shri sanjeev khandelwal, ward no.11 birsinghpur pali for filling subsid

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Excavation, loading and transportation of iron ore rom

Excavation, loading and transportation of iron ore rom (0-900mm size) from working faces of dulki iron ore mine to crushing plants bunker/ surge pile of rajhara/ dalli and unloading the same, loading and transportation of intercalated waste (icw) / sub grade minerals from working faces to respective dump yards, including unloading and levelling. all operations are to be done by mechanized means.