Tender Details
Particulars | Details |
---|---|
Title |
Wbpwrd/Se/Whc Ii/Nit 33/23 24
|
Description |
Panchmura To Arrah Road From 0.00 Kmp To 9.90 Km, Strengthening Work Under Bankura Highway Division In The District Of Bankura Under Ridf Xxix
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2023_WBPWD_633474_1 |
Reference Number |
WBPWRD/SE/WHC-II/NIT_33/23-24 |
Tender Fee | 0 |
EMD | 10 Lakh |
Tender Value | |
Place | Bankura |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1357536 |
Start Date | January 12, 2024 15:30 |
End Date |
29/01/2024 ( Expired 468 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreof your Industry type