Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Buttress Wall Beside 14 Service Center Below The Active Waste Dump 40 Mtr And 30 Mtr In Length At Dep 14 Biom Kirandul Complex
|
Description |
Construction Of Buttress Wall Beside 14 Service Center Below The Active Waste Dump 40 Mtr And 30 Mtr In Length At Dep 14 Biom Kirandul Complex
|
Organisation | NMDC Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 84300 |
Tender Value | |
Place | NMDC KIRANDUL |
Link |
AAAAAAAAAA Login to view |
Start Date | June 14, 2025 00:00 |
End Date |
12/07/2025 ( 28 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Read moreConstruction of buttress wall below the 1065 mb level buttress wall of dep- 14 (20 meter in length) at dep 14 biom kirandul complex
Construction of buttress wall below the 1065 mb level buttress wall of dep- 14 (20 meter in length) at dep 14 biom kirandul complex
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of buttress wall at the toe of existing waste dump of 11ml (200 mtr length) dep 11c mines biom kirandul complex
Construction of buttress wall at the toe of existing waste dump of 11ml (200 mtr length) dep 11c mines biom kirandul complex
Read moreConstruction of buttress wall towards eastern side drain slope of 994 mb bench 50 meter and 30 meter length dep 11c biom kirandul complex
Construction of buttress wall towards eastern side drain slope of 994 mb bench 50 meter and 30 meter length dep 11c biom kirandul complex
Read moreConstruction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex
Construction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex
Read moreCleaning of spilled iron ore in and around loading plant conveyors and surrounding areas during monsoon period at loading plant, biom, kirandul complex
Cleaning of spilled iron ore in and around loading plant conveyors and surrounding areas during monsoon period at loading plant, biom, kirandul complex
Read moreConstruction of buttress wall at the toe of existing waste dump of 14 mnz ml 1066 mb 150 mtr length at dep 11c biom kirandul complex
Construction of buttress wall at the toe of existing waste dump of 14 mnz ml 1066 mb 150 mtr length at dep 11c biom kirandul complex
Read moreof your Industry type