Tender Details

Particulars Details
Title
Construction Of Buttress Wall At The Toe Of Existing Waste Dump, Inactive Dump (100 Meter In Length) 11 B Mining, Biom Kirandul Complex
Description
Construction Of Buttress Wall At The Toe Of Existing Waste Dump, Inactive Dump (100 Meter In Length) 11 B Mining, Biom Kirandul Complex
Organisation NMDC Limited | Central Govt. Ministry/Department
Tender Id 2025_NMDC_800368_1
Reference
Number
KDL/CTRT/BUTTRESS WALL 11B-100MTR/INACTIVE/2025/85
Tender Fee 0
EMD 1.23 Lakh
Tender Value
Place NMDC KIRANDUL
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1105017

Start Date June 03, 2025 19:00
End Date
Expired 01/07/2025

Expired 342 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of residences for officials, consular area and associated ancillary services in the existing diplomatic complex for embassy of india, ankara

Construction of residences for officials, consular area and associated ancillary services in the existing diplomatic complex for embassy of india, ankara

Read more
Processing and disposal of old accumulated legacy waste at the dumping ground in mangrulpir city dist washim through bio-mining under swachh maharashtra mission (urban) 2.0

Processing and disposal of old accumulated legacy waste at the dumping ground in mangrulpir city dist washim through bio-mining under swachh maharashtra mission (urban) 2.0

Read more
Construction of boundary wall along with rcc retaining wall in the allotted land of lok bhavan in rs plot no. 2132/p, mouja kunjaban under capital complex sub-division-i, pwd (b), kunjaban extension, agartala.

Construction of boundary wall along with rcc retaining wall in the allotted land of lok bhavan in rs plot no. 2132/p, mouja kunjaban under capital complex sub-division-i, pwd (b), kunjaban extension, agartala.

Read more
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim

Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim

Read more
Investigation, design and construction of civil structure (sub structure and super structure) works for spire , parking ring, roof, approach bridges over palavagu, shallow water around the legislative assembly building including earthwork, pile or raft foundations, rcc framed structure consisting of retaining wall, shear/core wall, slabs, beam, pt slab and beam inclined/flared shear walls, columns, using modular/system / fair finish/express formwork,, reinforcement works, waterproofing and

Investigation, design and construction of civil structure (sub structure and super structure) works for spire , parking ring, roof, approach bridges over palavagu, shallow water around the legislative assembly building including earthwork, pile or raft foundations, rcc framed structure consisting of retaining wall, shear/core wall, slabs, beam, pt slab and beam inclined/flared shear walls, columns, using modular/system / fair finish/express formwork,, reinforcement works, waterproofing and miscellaneous works for legislative assembly building in super block e of amaravati government complex area in amaravati capital city, andhra pradesh on lump sum contract (percentage tender) system

Read more
Construction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex

Construction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex

Read more
Construction of buttress wall at the toe of existing waste dump of 11ml (200 mtr length) dep 11c mines biom kirandul complex

Construction of buttress wall at the toe of existing waste dump of 11ml (200 mtr length) dep 11c mines biom kirandul complex

Read more
Construction of buttress wall at the eastern side drain slopes of crushing plant 11b (125 mtr in length) 11b mining, biom kirandul complex

Construction of buttress wall at the eastern side drain slopes of crushing plant 11b (125 mtr in length) 11b mining, biom kirandul complex

Read more
Construction of buttress wall at the toe of existing waste dump of 14 mnz ml 1066 mb 150 mtr length at dep 11c biom kirandul complex

Construction of buttress wall at the toe of existing waste dump of 14 mnz ml 1066 mb 150 mtr length at dep 11c biom kirandul complex

Read more
Construction of buttress wall near waste dump of 1029 mb level (40 mtr in length) at dep 14, biom kirandul complex

Construction of buttress wall near waste dump of 1029 mb level (40 mtr in length) at dep 14, biom kirandul complex

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise