Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Buttress Wall At The Eastern Side Drain Slopes Of Crushing Plant 11 B (125 Mtr In Length) 11 B Mining, Biom Kirandul Complex
|
Description |
Construction Of Buttress Wall At The Eastern Side Drain Slopes Of Crushing Plant 11 B (125 Mtr In Length) 11 B Mining, Biom Kirandul Complex
|
Organisation | NMDC Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1.52 Lakh |
Tender Value | |
Place | NMDC KIRANDUL |
Link |
AAAAAAAAAA Login to view |
Start Date | June 01, 2025 17:00 |
End Date |
27/06/2025 ( 24 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of retaining wall and stabilization of slope for new crushing plant at sitapatore mine.
Construction of retaining wall and stabilization of slope for new crushing plant at sitapatore mine.
Read moreConstruction of buttress wall at the eastern side drain slopes of crushing plant 11b (125 mtr in length) 11b mining, biom kirandul complex
Construction of buttress wall at the eastern side drain slopes of crushing plant 11b (125 mtr in length) 11b mining, biom kirandul complex
Read moreConstruction of buttress wall near waste dump of 1029 mb level (40 mtr in length) at dep 14, biom kirandul complex
Construction of buttress wall near waste dump of 1029 mb level (40 mtr in length) at dep 14, biom kirandul complex
Read moreGandhi nagar and indira nagar construction of side wall of drain in the middle under ward no. 05
Gandhi nagar and indira nagar construction of side wall of drain in the middle under ward no. 05
Read moreConstruction of boundary wall around sepahijala zoo in deer park area for a portion of length 525 point 00 mtr (phase_i)
Construction of boundary wall around sepahijala zoo in deer park area for a portion of length 525 point 00 mtr (phase_i)
Read moreOne time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
One time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
Read moreCapital grand fund 2024-2025 construction of retaining wall at main road channel south side kaliyamman koil street to arisikadai bus stand in devadanapatti town panchayat
Construction of retaining wall at main road channel south side kaliyamman koil street to arisikadai bus stand in devadanapatti town panchayat
Read moreMla fund 2025-26 construction of strom water drain with culvert at ward no.17 kenjaiyankulam (alamarathu school back side) in cumbum municipality.
Mla fund 2025-26 construction of strom water drain with culvert at ward no.17 kenjaiyankulam (alamarathu school back side) in cumbum municipality.
Read moreof your Industry type