Tender Details
Particulars | Details |
---|---|
Title |
Set Of Rubber Packing (Gasket) For Doors & S Of 3 Phase Locos Set Consisting Of 9 Items
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106269335 |
Reference Number |
02234245 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/032024/106269335/viewNitPdf_4483425.pdf |
Start Date | February 15, 2024 18:12 |
End Date |
05/03/2024 ( Expired 443 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement work of existing porcelain disc insulator strings by silicon rubber housed composite insulator (120 kn suspension type) for 400 kv s/c ratangarh stps ckt 1st and ckt 2nd at suspension towers
Replacement work of existing porcelain disc insulator strings by silicon rubber housed composite insulator (120 kn suspension type) for 400 kv s/c ratangarh-stps ckt 1st and ckt 2nd at suspension towers
Read moreUnder central government sponsored amrut 2.0 program pune municipal corporation invites e tender for the work of construction of 125 mld capacity water treatment plant phase 3 with operation and maintenance of the wtp for 7 years at vadgaon, pune
Under central government sponsored amrut 2.0 program pune municipal corporation invites e tender for the work of construction of 125 mld capacity water treatment plant phase 3 with operation and maintenance of the wtp for 7 years at vadgaon, pune
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreProcurement of high-durability, weather-resistant fabricated enclosure boxes with hinged doors, pu gasket sealing, powder coating, and advanced secure locking for sru bhandaridah
Procurement of high-durability, weather-resistant fabricated enclosure boxes with hinged doors, pu gasket sealing, powder coating, and advanced secure locking for sru bhandaridah
Read morePetty repair and day to day maintenance of plumbing, sanitary items, wooden/steel joinery works, bath fittings, false ceiling, tiling works and other b/r works for md accn of zone 8 and 9 under ge (n) tezpur
Petty repair and day to day maintenance of plumbing, sanitary items, wooden/steel joinery works, bath fittings, false ceiling, tiling works and other b/r works for md accn of zone 8 and 9 under ge (n) tezpur
Read moreAnnual percentage rate contract on mes ssr 2020 for civil maintenance of doors, s , wire mesh glasses, shutter and including other connected works of f-1,f-2, f-3,f-4,f-5,f-6, f-7 and f-9 in filling area inside at ofk.
Annual percentage rate contract on mes ssr 2020 for civil maintenance of doors, s , wire mesh glasses, shutter and including other connected works of f-1,f-2, f-3,f-4,f-5,f-6, f-7 and f-9 in filling area inside at ofk.
Read moreThreading insert for 155mm erfb base thread machining consisting of items in one set as per annexur
Read more
Rubber diaphragm for pneumatic motorized actuator having tag tapp 3&4/3211-mv-6 and 9,rubber diaphr
Read more
Laying of buried piping for fire hydrant system phase 3 at prp site kalpakkam
Laying of buried piping for fire hydrant system phase 3 at prp site kalpakkam
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreof your Industry type