Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🚂 Invitation For Bids: 25 Kv Electrification Work 🏗️🔧 The Ministry Of Railways, Specifically The Central Government Ministry/Department, Is Calling For Bids From Experienced Contractors For The 25 Kv Electrification Work In Connection With The Provision Of A Limited Height Subway (Lhsw) At L Xing No 24 Spl. At Km 201/2 3 And L Xing No 25 At Km 202/6 7 On The Arj Bsb Section Of The N. E. Railway, Varanasi Division. 📅 Bid Submission Deadline: May 16, 2024, 2:45 Pm Earnest Money Deposit (Emd): Inr 183,900 Interested Bidders Are Advised To Review The Complete Tender Document For Detailed Specifications, Project Scope, And Submission Guidelines. Keywords: Electrification Work, Railway, Infrastructure, Electrical Contractors, Ministry Of Railways, Tender, Bid Submission, Emd, Varanasi DivisionParticulars | Details |
---|---|
Title |
25 Kv Electrification Work In Connection With Provision Of Limited Height Subway (Lhsw) At L Xing No 24 Spl. At Km 201/2 3 &Amp L Xing No 25 At Km 202/6 7, Arj Bsb Section Of N. E. Railway, Varanasi Division
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74613331 |
Reference Number |
SrDEE-TRD-BSB-2024-25-T04 |
Tender Fee | 0 |
EMD | 1.84 Lakh |
Tender Value | |
Place | Gorakhpur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74613331/viewNitPdf_4536850.pdf |
Start Date | April 24, 2024 22:54 |
End Date |
16/05/2024 ( Expired 408 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.
Construction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.
Read moreElectrical trd portion of work in connection with provision of safety fencing (acb & fixed knot fencing) along the track 1) from km 270 to km 293.125 in dd-sur section, 2) from km 293.125 to km 316.25 in dd-sur section, 3) under cpwi/jeur from prwd-jh, 4) under cpwi/kwv(n) from jh-kwv, 5) under cpwi/kwv(s) kwv-wka part-1, 6) under cpwi/kwv(s) wka-mo part-2 and 7) under cpwi/sur(n). (re-invitation)
For complete deion and other details, please refer to tender
Read moreConstruction of complete rob & limited height subway in lieu of lc 4 (railway portion except steel girder approach road in state portion) at km 60/23-25 in indara yard, lc 67c (railway portion including steel girder approach road in state portion) at km 95/273 between kkt-pou section & lc 115 (only railway portion including bow string girder) at km 433/723 in btt yard of varanasi division in n. e. railway
For complete deion and other details, please refer to tender
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of 4 lane rob including railway portion with n type steel girder and composite girder on pile foundation. psc girder on pile foundation and reinforced earth (re) wall in approaches in lieu of lc no. 25-b at rly. km 591/6-7 between jatpipli -bajana stations on viramgam - samakhiyali section of ahmedabad division of western railway under gati shakti unit, ahmedabad.
For complete deion and other details, please refer to tender
Read moreDesign, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works, in connection with following works : (1)construction of rub in lieu of lc no. jk-6 at km. 545k/21-22 on jalamb-khamgaon section. (2)construction of rob at rly. km. 417/23n-25n on jalgaon-shirsoli section.
For complete deion and other details, please refer to tender
Read moreof your Industry type