Tender Details

Particulars Details
Title
Irqp Work Of Chakulia Matihani Road (Length 27.60 Km) For The Year 2024 25
Description
Irqp Work Of Chakulia Matihani Road (Length 27.60 Km) For The Year 2024 25
Organisation RCD EinC | State Govt. and UT
Tender Id 2024_CECOM_94928_1
Reference
Number
RCD/JAMSHEDPUR- 1745/2024-25
Tender Fee 10000
EMD 17.66 Lakh
Tender Value -
Place Chakulia Matihani
Link
View Original Tender Notice

https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=127716

Start Date October 04, 2024 18:00
End Date
Expired 14/10/2024

Expired 727 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg

Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg

Read more
Supply of electric winch 2mt capacity with wire rope of size 60m*18mm (length*diameter) for movement of manpower in surge chamber at slbhes, srisailam dam west nagarkurnool (dist) - 509326, telangana

Supply of electric winch 2mt capacity with wire rope of size 60m*18mm (length*diameter) for movement of manpower in surge chamber at slbhes, srisailam dam west nagarkurnool (dist) - 509326, telangana

Read more
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call

Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call

Read more
Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Read more
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.

Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Irqp/strengthening work in muri station road (length 1.00 km)

Irqp/strengthening work in muri station road (length 1.00 km)

Read more
Irqp of chakradharpur-toklo-kuchai road total length (22.17 k.m.)

Irqp of chakradharpur-toklo-kuchai road total length (22.17 k.m.)

Read more
Strengthening irqp work of hussainabad pathraghat road total length- 29.10 km

Strengthening irqp work of hussainabad pathraghat road total length- 29.10 km

Read more
Irqp/strengthening work in jonha by pass road (length 1.60 km)

Irqp/strengthening work in jonha by pass road (length 1.60 km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise