Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Construction Of (Balance Work) Kutru To Farsegarh Road Length 12.60 Km I/C Bridge &Ampamp Culvert, Block Bhairamgarh, Dist Bijapur (Cg) (Under Nabard Scheme)
|
Organisation | Chhattisgarh Infotech Promotion Society | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 5 Lakh |
Tender Value | |
Place | Public Works Department (PWD) , CHHATTISGAHR |
Link |
AAAAAAAAAA Login to view |
Start Date | April 11, 2025 22:30 |
End Date |
02/05/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreReplacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreConstruction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreG.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
Read moreWbphed/01/bwn of se/cc of 2025-26 sl.no.2
Balance work such as construction of approach road sinking of additional tube well construction of pump house land development and other allied work for different pwss under mangolkote block under katwa subdivn within burdwan divn phe dte.
Read moreStrengthening of the road mrl-02 m.edayapatti to thethur road km 0/0-5/380,marungapuri block,tiruchirappalli dt.under pmgsy batch-i-2024-25 including maintenance of 5 year pkg no.tn22-219
Strengthening of the road mrl-02 m.edayapatti to thethur road km 0/0-5/380,marungapuri block,tiruchirappalli dt.under pmgsy batch-i-2024-25 including maintenance of 5 year pkg no.tn22-219
Read moreof your Industry type