Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design Manufacture Supply Installation Testing And Commissioning Including Two Years Comprehensive Dlp Maintenance Of Heavy Duty Machine Room Less Elevators And Heavy Duty Escalators Of 13 Elevated Stations For Mumbai Metro Line 6
|
| Description |
Design Manufacture Supply Installation Testing And Commissioning Including Two Years Comprehensive Dlp Maintenance Of Heavy Duty Machine Room Less Elevators And Heavy Duty Escalators Of 13 Elevated Stations For Mumbai Metro Line 6
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_MMRDA_933734_1 |
|
Reference Number |
MMRDA/6/MMRP/CA-131 |
| Tender Fee | 3540 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | MMRDA BKC |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | September 20, 2023 15:30 |
| End Date |
Expired
19/10/2023
Expired 1092 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreConstruction of viaduct and elevated stations of gurugram metro rail limited
Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.
Read moreDesign, manufacture, supply, installation, testing and commissioning of telecommunication system for 3 stations of jmrts phase-1c and 1d project.
Design, manufacture, supply, installation, testing and commissioning of telecommunication system for 3 stations of jmrts phase-1c and 1d project.
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection (afc) for 3 new stations including central system, rajasthan, india
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection (afc) for 3 new stations including central system, rajasthan, india
Read moreCustom bid for services - design, manufacture, supply, installation, testing, commissioning and maintenance of voice enabled smart ticketing kiosk solution at 3 stations of lucknow metro
Custom bid for services - design, manufacture, supply, installation, testing, commissioning and maintenance of voice enabled smart ticketing kiosk solution at 3 stations of lucknow metro
Read moreAnnual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Annual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Read moreDesign and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Read moreDdc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Ddc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Read moreAnnual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Annual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Read morePart design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Read moreof your Industry type