Tender Details

Particulars Details
Title
Construction Of New Compound Wall For The Ground Towards East And West Side Of Main Entrance In Division 71 Unit 17 Zone 6
Description
Construction Of New Compound Wall For The Ground Towards East And West Side Of Main Entrance In Division 71 Unit 17 Zone 6
Organisation Corporation of Chennai | State Govt. and UT
Tender Id 2025_CoC_533021_1
Reference
Number
Z.O.VI.C.NO.E1/10126/2025/1
Tender Fee 0
EMD 9000
Tender Value
Place CHENNAI
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=634464
Start Date March 17, 2025 20:30
End Date

27/03/2025 ( Expired 47 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat

Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat

Read more
Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m

Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m

Read more
Consultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal

Consultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal

Read more
Repair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar

Repair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar

Read more
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala

Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala

Read more
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Read more
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec

Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec

Read more
Replacement of 600 mm dia psc pipe to 600 mm di pipe - paichaiyar river to railway bridge west side sluice value and railway bridge east side sluice value to munnerpalam police station at suthamali head work to magalizchi nagar pumping main.

Replacement of 600 mm dia psc pipe to 600 mm di pipe - paichaiyar river to railway bridge west side sluice value and railway bridge east side sluice value to munnerpalam police station at suthamali head work to magalizchi nagar pumping main.

Read more
Construction of compound wall for balance social facility plots at nagar- i, ii and iv cidco waluj mahanagar.

Construction of compound wall for balance social facility plots at nagar- i, ii and iv cidco waluj mahanagar.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise