Tender Details

Particulars Details
Title
P/F Safety Grill , Ms Gate And Fancing At Pepsi Compound, W.E.Highway In Beat No. 73 In K/E Ward.
Description
P/F Safety Grill , Ms Gate And Fancing At Pepsi Compound, W.E.Highway In &Amp#X0d Beat No. 73 In K/E Ward.
Organisation Municipal Corporation of Greater Mumbai | State Govt. and UT
Tender Id 2025_MCGM_1157442_1
Reference
Number
XKE-24-173.027
Tender Fee 4394
EMD 15142
Tender Value -
Place K/E
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2013336

Start Date March 05, 2025 23:00
End Date
Expired 10/03/2025

Expired 585 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repairs to safety grill at vijay nagar flyover and marol maternity home, marol, andheri (east) in beat no. 75 in k/south ward.

Repairs to safety grill at vijay nagar flyover and marol maternity home, marol, andheri (east) in beat no. 75 in k/south ward.

Read more
Supply of ms grating at different places, andheri (e), beat no-81 in k/south ward.

Supply of ms grating at different places, andheri (e), beat no-81 in k/south ward.

Read more
Imp of pathways and drainge at mnt compound, andheri (e), beat no.-81 in k/south ward.

Imp of pathways and drainge at mnt compound, andheri (e), beat no.-81 in k/south ward.

Read more
Repairs of gazebo and compound wall at vrindavn garden, maheswari nagar, andheri (e) beat no. 76 k/south ward.

Repairs of gazebo and compound wall at vrindavn garden, maheswari nagar, andheri (e) beat no. 76 k/south ward.

Read more
Imp of pathways and drainge at neeta house, mnt compound, andheri (e), beat no.-81 in k/south ward.

Imp of pathways and drainge at neeta house, mnt compound, andheri (e), beat no.-81 in k/south ward.

Read more
Smriti upwan park mein buddha sculpture ground cover parking ka gate pathway ro plant ms grill, duck pond repair main gate floor k sand stone pathway ki marramat yoga esthal awashesh hdp pipe line karya, gaurd room compost machine ki .....

Smriti upwan park mein buddha sculpture ground cover parking ka gate pathway ro plant ms grill, duck pond repair main gate floor k sand stone pathway ki marramat yoga esthal awashesh hdp pipe line karya, gaurd room compost machine ki .......

Read more
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Read more
Construction of compound wall at pepsi compound, w.e.highway in beat no. 73 in k/e ward.

Construction of compound wall at pepsi compound, w.e.highway in beat &amp#x0d no. 73 in k/e ward. &amp#x0d

Read more
Repair for compound wall safety grill of bharat van garden, marol andheri (east) in beat no 75 in k/e ward.

Repair for compound wall safety grill of bharat van garden, marol andheri (east) in beat no 75 in k/e ward.

Read more
P/f ms safety grill and civil work at gagangiri maharaj maidan, sarvodaya nagar, jogeshwari (e) in beat no. 77 in k/e ward.

P/f ms safety grill and civil work at gagangiri maharaj maidan, sarvodaya &amp#x0d nagar, jogeshwari (e) in beat no. 77 in k/e ward. &amp#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise