Tender Details

Particulars Details
Title
M/O Hort. Works At Non Residential Buildings Under Hort. Sub Division East Iii, Hort. Divn East(m 214)), Pwd, Delhi During 2025 26
Description
(Sh Providing And Planting Of Shrubs And Ground Cover Plants Delhi Vidhan Sabha, L.G. Secretariate, Session House 2, M.S.O. Building And Vikas Bhawan 1 And 2).
Organisation Public Works Department | State Govt. and UT
Tender Id 2025_PWD_276757_1
Reference
Number
25/ DDH/HD East/PWD/GNCTD/2025-26
Tender Fee 0
EMD 35176
Tender Value -
Place Dy. Director (Hort.), Hort.Div.M-214, PWD, Delhi
Link
View Original Tender Notice

https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=365013

Start Date August 13, 2025 23:30
End Date
Expired 21/08/2025

Expired 417 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Estimate for maintenance of central median at east anandbagh central median from nmdc clony to east anandbagh rub in malkajgiri circle 05 malkajgiri zone mmc for the 12 months during the year 2026 27

Estimate for maintenance of central median at east anandbagh central median from nmdc clony to east anandbagh rub in malkajgiri circle 05 malkajgiri zone mmc for the 12 months during the year 2026 27

Read more
Bmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27

Bmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27

Read more
Providing necessary civil and sanitary works in quarter no.109, main block, ms-iii, 120 flats mlas residential complex at hyderguda, hyderabad.

Providing necessary civil and sanitary works in quarter no.109, main block, ms-iii, 120 flats mlas residential complex at hyderguda, hyderabad.

Read more
Procurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area

Procurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area

Read more
General electrical wiring and maintenance works to office buildings, area hospital and residential quarters in pv township, etc. for a period of 02 years on rate contract basis at manuguru area - reg.

General electrical wiring and maintenance works to office buildings, area hospital and residential quarters in pv township, etc. for a period of 02 years on rate contract basis at manuguru area - reg.

Read more
Providing box type cupboards, toilets renovation along with other civil and sanitary works in quarter no.102, main block, ms-iii, 120 flats mlas residential complex at hyderguda, hyderabad.

Providing box type cupboards, toilets renovation along with other civil and sanitary works in quarter no.102, main block, ms-iii, 120 flats mlas residential complex at hyderguda, hyderabad.

Read more
Providing box type cupboards, toilets renovation along with other civil and sanitary works in quarter no.908, main block, ms-iii, 120 flats mlas residential complex at hyderguda, hyderabad.

Providing box type cupboards, toilets renovation along with other civil and sanitary works in quarter no.908, main block, ms-iii, 120 flats mlas residential complex at hyderguda, hyderabad.

Read more
Providing box type cupboards, toilets renovation along with other civil and sanitary works in quarter no.806, main block, ms-iii, 120 flats mlas residential complex at hyderguda, hyderabad.

Providing box type cupboards, toilets renovation along with other civil and sanitary works in quarter no.806, main block, ms-iii, 120 flats mlas residential complex at hyderguda, hyderabad.

Read more
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)

Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise